HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

The country’s largest sulfur train loading facility has been fully renovated for the first time”

2025-12-25View Original

Thread Content

China’s largest sulfur train loading facility has been completely renovated for the first time. On February 24th, at the natural gas purification plant in the Puguang gas field of Sinopec’s Zhongyuan Oilfield, two sulfur train loading towers, each 25 meters tall and having operated side by side for 16 years, were fitted with a new bright blue coating that made them shine brightly in the sunlight. “This is the first full ‘upgrade’ since the operation of the country’s largest sulfur train loading facility began; safety has been improved, and confidence in ensuring a stable supply supply has increased further! ”The employees at the train loading station looked at the “steel giant” before them, their words filled with pride. As the core transportation hubs for China’s largest sulfur production bases, these two key facilities have been in safe operation for 16 years now; they have handled over 13 million tons of sulfur in total, undertaking nearly half of the sulfur loading tasks associated with the Puguang gas field. Due to prolonged exposure to an acidic environment and continuous high-load operation, the anti-corrosion coatings on its main structure, platforms, guardrails, and other components gradually deteriorate, posing risks to safe operation. To completely eliminate risks, the natural gas purification plant adhered to the requirements of the themed initiative \"80 Days of Safe Production to Ensure Successful Completion of the 14th Five-Year Plan,\" and launched the first comprehensive anti-corrosion project since the operation of the train loading facility. This project provided a \"protective armor\" for this \"steel giant,\" enabling simultaneous improvements in the inherent safety of the facilities as well as their overall appearance. Working at heights poses significant risks, and constructing multi-story structures is difficult. To ensure safe and efficient construction, the natural gas purification plant strictly adheres to safety control requirements and establishes a \"four-layer protection\" system: two life ropes are installed at key locations, and workers wear five-point safety belts throughout the operation ; The combination of a seating platform and a lifting work platform, along with a life rope attached to a safety belt and an anti-fall device also attached to a safety belt, is used to ensure full control over risks at heights ; Use aerial work platforms in the areas of the train loading yard suitable for vehicle operations to reduce the risks associated with human labor ; At the natural gas purification plant, leaders from both parties involved in the construction work were on site to oversee operations, with dual video surveillance ensuring constant monitoring; dynamic inspections were carried out on the work processes and safety measures to strengthen the safeguards for construction safety. Production must not stop, and renovations cannot wait. To ensure that construction and production proceed simultaneously without interference and to promote both, the natural gas purification plant established a dual-operation mechanism of \"constructing during the day and loading during the night,\" breaking down project milestones to specific times each day, and accelerating progress by working backwards from the deadline. From rust removal and grinding to primer application, and then to topcoat curing, every step is carefully controlled and every detail is refined to ensure high quality and efficiency in the work, thus providing a solid barrier for high-quality corrosion protection of the train loading facility.
Reply #22025-12-25
【Ten Years of Rapid Development in Chemical Engineering Equipment】The first nationwide test of ammonia-fueled operation of marine low-speed engines under all operating conditions was carried out in Qingdao from 2925 to 2025. https://bbs.hcbbs.com/thread-5709443-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #32025-12-25
【HaiChuan Safety Discussion】Hidden Dangers Around Us – Friends in the North, Check More! ! No warnings in place below where water vapor condenses into ice spikes in pipes https://bbs.hcbbs.com/thread-5709472-1-1.html (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
Reply #42025-12-25
【Ten Years of Rapid Development in Chemical Equipment】2915-2025: Amazing! China achieves for the first time the high-temperature cooling and transportation of oil, gas, and water mixtures using offshore unmanned platforms https://bbs.hcbbs.com/thread-5709132-1-1.html (Source: HaiChuan Chemical Industry Forum (HuaHaiChuanLiu hcbbs))
Reply #52025-12-26
【Ten Years of Rapid Development in Chemical Equipment】From 2018 to 2025, Shandong Zhanggu successfully developed its first domestically produced TEP steam compressor, which was then shipped out. https://bbs.hcbbs.com/thread-5709282-1-1.html (Source: Haichuan Chemical Forum (HCBBS))
Reply #62025-12-26
【Ten Years of Rapid Development in Chemical Equipment】The pilot production base of the Hami High-Oil Coal Research Institute, covering the period 2020–2025, was officially put into use in Yiwu County. https://bbs.hcbbs.com/thread-5709304-1-1.html (Source: Haichuan Chemical Forum (HCBBS))
Reply #72025-12-27
【Ten Years of Rapid Development in Chemical Engineering Equipment】The world’s largest single PEM hydrogen production electrolyzer was successfully produced at CRRC in Zhuzhou from 2921 to 2025. https://bbs.hcbbs.com/thread-5709309-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #82025-12-27
【Ten Years of Rapid Development in Chemical Equipment】Major breakthroughs from 2024 to 2025! ! Two breakthroughs in domestic high-end electric drives: ultra-high-speed motors capable of operating at tens of thousands of revolutions per minute and motors with a vacuum distribution capacity of 100,000 have passed certification. https://bbs.hcbbs.com/thread-5709405-1-1.html (Source: HaiChuan Chemical Industry Forum (HuaHaiChuanLiu hcbbs))
Reply #92025-12-27
【Ten Years of Rapid Development in Chemical Engineering Equipment】The first nationwide test of ammonia-fueled operation of marine low-speed engines under all operating conditions was carried out in Qingdao from 2925 to 2025. https://bbs.hcbbs.com/thread-5709443-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #102025-12-27
【Ten Years of Rapid Development in Chemical Processing Equipment】From 2027 to 2025, Yanshan Petrochemical’s 1.2 million tons per year gasoline adsorption desulfurization unit became the first of its kind in China to receive carbon neutrality certification. https://bbs.hcbbs.com/thread-5709493-1-1.html (Source: Hachuan Chemical Industry Forum (HCHBBS))

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.