HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Henan Hebi Hongmeng New Materials Co., Ltd.’s project for producing 5,600 tons of electronic chemicals per year and 10,000 tons of NMP through recycling

2025-11-21View Original

Thread Content

Recently, the annual production project of 5,600 tons of electronic chemicals and 10,000 tons of NMP for recycling at Henan Hongmeng New Materials Co., Ltd. was announced on relevant websites. This project, with a total investment of 456 million yuan, is located in the Moushan Industrial Park in Shancheng District, Hebi City, and will involve the construction of an electronic-grade sulfur dioxide production line as well as NMP recycling facilities. According to the public information, the project will employ two entirely different process routes, one for each of the two products. The electronic-grade sulfur dioxide production line will follow the process flow of \"sulfur combustion – sulfur recovery – conversion – sulfur removal – purification – refinement – condensation\", ultimately enabling the bottled and sale of sulfur dioxide. The regeneration and recycling of NMP employ multi-stage distillation technology; through the processes of \"primary dehydration – secondary dehydration – distillation\", crude NMP is converted into high-purity products that can be reused. This patented technology separates liquids from waste gases by condensing the exhaust gas from the atmospheric and vacuum distillation tower, and then achieves efficient recovery of NMP through multiple processes such as heat exchange cooling and rotary wheel adsorption/desorption. The main equipment of the project includes waste heat boilers, sulfur incineration furnaces, desulfurization reactors, sulfur separation tanks, dehydration towers, refining towers, etc., which form a complete production system. Project Overview: Project Name: Project for the annual production of 5,600 tons of electronic chemicals and 10,000 tons of NMP through recycling. Developer: Henan Hongmeng New Materials Co., Ltd. Location: No. 8 Mouxing Avenue, Moushan Industrial Park, Shancheng District, Hebi City. Nature of the project: New construction. Investment amount: Approximately 456 million yuan. Scale and scope of the project: The project covers an area of 39,790.78 square meters; it makes use of the existing production workshops, utility facilities, auxiliary systems, and tank areas available at the company to produce 5,600 tons of electronic chemicals and 10,000 tons of NMP per year. The production capacity for electronic-grade sulfur dioxide is 5,600 tons per year, while the production capacity for NMP is 10,000 tons per year. Main equipment: waste heat boiler, sulfur incinerator, desulfurization reactor, sulfur separation tank, dehydration tower, purification tower, etc. Process flow: sulfur combustion–sulfur recovery–conversion–desulfurization–purification–refinement–condensation–packing sulfur dioxide for sale ; Crude NMP — primary dehydration — secondary dehydration — distillation — NMP is packaged and sold. Henan Hongmeng New Materials Co., Ltd. is located at No. 8 Muxing Avenue, Moushan Industrial Park, Shancheng District, Hebi City. With a total land area of 39,790.78㎡, the company is mainly engaged in the manufacturing of specialty chemical products, the production of synthetic materials, as well as the research, development, production, and sales of related processes and equipment.
Reply #22025-11-21
[Common Issues in Haichuan Pipeline Design] – A compilation post; images and text are being updated. Feel free to join the discussion: https://bbs.hcbbs.com/thread-5705828-1-1.html (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
Reply #32025-11-21
【HaiChuan Safety Discussion】Compilation of Hidden Dangers Around Us – with pictures and texts; everyone is welcome to join the discussion: https://bbs.hcbbs.com/thread-5705518-1-1.html (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
Reply #42025-11-22
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2028 to 2025, Lanshi Group developed China’s first 90MPa ionic liquid hydrogen compressor, which underwent 90MPa hydrogen cycle pressurization tests. https://bbs.hcbbs.com/thread-5705737-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #52025-11-22
【Ten Years of Rapid Development in Chemical Equipment】2841-2025: Longyu’s low-temperature heat coupling distillation technology for coal chemical processing recognized https://bbs.hcbbs.com/thread-5705831-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #62025-11-23
【Ten Years of Rapid Development in Chemical Processing Equipment】2842-2025 **The research on ‘Key Technologies for Surface Treatment of Storage Tanks in Pipeline Systems, as well as the Development and Industrial Application of Intelligent Maintenance Systems’ has been evaluated as being at an internationally leading level** https://bbs.hcbbs.com/thread-5705865-1-1.html (Source: HaiChuan Chemical Industry Forum (HCBBS))
Reply #72025-11-23
【Ten Years of Rapid Development in Chemical Equipment】The world’s largest seamless steel pipe production line, 2843-2025, was officially put into operation at Shandong Guangfu Group. https://bbs.hcbbs.com/thread-5705991-1-1.html (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
Reply #82025-11-23
【Ten Years of Rapid Development in Chemical Engineering Equipment】2844-2025: China’s first project for generating electricity from the residual pressure of high-pressure natural gas transmission pipelines – the Haimen Station natural gas residual pressure power generation project – has been put into operation in Nantong, Jiangsu. https://bbs.hcbbs.com/thread-5706004-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #92025-11-23
【Ten Years of Rapid Development in Chemical Engineering Equipment】The 2845-2025 2MW/600℃ ultra-high temperature heat pump energy storage demonstration project was successfully commissioned on its first attempt. https://bbs.hcbbs.com/thread-5706020-1-1.html (Source: Haichuan Chemical Engineering Forum (Hua Haichuan Liu hcbbs))
Reply #102025-11-24
【Ten Years of Rapid Development in Chemical Engineering Equipment】China-made desalination modules for European methanol projects were officially delivered and shipped, 2829–2025 https://bbs.hcbbs.com/thread-5705395-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #112025-11-24
【Ten Years of Rapid Development in Chemical Engineering Equipment】The 2845-2025 2MW/600℃ ultra-high temperature heat pump energy storage demonstration project was successfully commissioned on its first attempt. https://bbs.hcbbs.com/thread-5706020-1-1.html (Source: Haichuan Chemical Engineering Forum (Hua Haichuan Liu hcbbs))

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.