HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

The third section of the regenerator at the Dongming project site was successfully capped

2025-12-27View Original

Thread Content

On December 18, the Dongming project team successfully completed the lifting of the roof for the third section of the regenerator. This achievement marked the first time in the company’s history that a structure of over a thousand tons was lifted, demonstrating the company’s strong capabilities in handling extremely heavy equipment.
Reply #22025-12-27
【Haichuan Equipment Guessing Game】Does anyone know it? ? What kind of storage tank is this? Why does it have such a structure inside? https://bbs.hcbbs.com/thread-5709647-1-1.html (Source: Haichuan Chemical Industry Forum (Hua Hai Chuan Liu hcbbs))
Reply #32025-12-27
【Ten Years of Rapid Development in Chemical Equipment】Major breakthroughs from 2024 to 2025! ! Two breakthroughs in domestic high-end electric drives: ultra-high-speed motors capable of operating at 10,000 revolutions per minute and motors with a vacuum distribution system capable of handling 100,000 units have passed the evaluation process. https://bbs.hcbbs.com/thread-5709405-1-1.html (Source: Haimen Chemical Industry Forum (HCBBS))
Reply #42025-12-28
【Ten Years of Rapid Development in Chemical Processing Equipment】From 2027 to 2025, Yanshan Petrochemical’s 1.2 million tons per year gasoline adsorption desulfurization unit became the first of its kind in China to obtain carbon neutrality certification. https://bbs.hcbbs.com/thread-5709493-1-1.html (Source: HCBBS Chemical Forum)
Reply #52025-12-29
【Ten Years of Rapid Development in Chemical Processing Equipment】From 2030 to 2025, Shaanxi Gas Turbine Power, in collaboration with Ningxia Runxia, carried out China’s first project to convert nitric acid production units from steam-driven to electric-driven systems. https://bbs.hcbbs.com/thread-5709560-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #62025-12-29
【Ten Years of Rapid Development in Chemical Engineering Equipment】The first industrial unit for aerospace pyrolysis, under the 2931-2025 project, was mechanically completed in the first phase of the solid and hazardous waste recycling project in Bayannur, Inner Mongolia. https://bbs.hcbbs.com/thread-5709594-1-1.html (Source: HaiChuan Chemical Industry Forum (HCBBS))
Reply #72025-12-29
【Ten Years of Rapid Development in Chemical Engineering Equipment】2931-2025: Dongfang Electric makes new breakthroughs in direct seawater electrolysis for hydrogen production, achieving 1000 hours of continuous operation https://bbs.hcbbs.com/thread-5709640-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #82025-12-29
【Ten Years of Rapid Development in Chemical Engineering Equipment】First-of-its-kind domestic unmanned emergency rescue equipment set released 2933-2025 https://bbs.hcbbs.com/thread-5709649-1-1.html (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.