Thread Content
Yongtai Technology’s 150,000-ton electrolyte capacity expansion project has been approved! 2025-08-15 13:19:14 On August 12, the People’s Government of Linhai issued the \"Announcement dated August 12, 2025, by the Linhai Branch of the Taizhou Ecology and Environment Bureau regarding the filing of environmental impact assessment documents for projects related to the ‘regional environmental impact assessment + environmental standards’ reform in Linhai.\" Project Name: Technical renovation project for an electrolyte production line with an annual output of 150,000 tons at Zhejiang Yongtai New Energy Materials Co., Ltd.
Project Owner: Zhejiang Yongtai New Energy Materials Co., Ltd.
Project Investment: 29 million yuan
Construction Content and Scale: This project makes use of the existing factory premises and workshops, and involves the purchase of domestic equipment such as filters, storage tanks, and electrolyte containers. It aims to carry out technical renovations to the electrolyte production line with an annual output of 150,000 tons by adding additives and installing filtration and purification facilities. The filtration and purification of the electrolyte mixture help to reduce damage to equipment and lower safety risks. At the same time, DCS control measures for liquid level, temperature, flow rate, etc., have been implemented to enhance automation, reduce manual operation, make the electrolyte premix treatment process safer, and improve product quality. The project has been registered with the Taizhou Bay Economic and Technological Development Zone in Linhai City, and its project code is: 2503-331082-99-02-125027.
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2614 to 2025: ANGANG Group’s AG785 spherical tank steel, with a strength and toughness level of 785 MPa as well as high pressure resistance, was introduced globally for use in deep-sea containers. https://bbs.hcbbs.com/thread-5698753-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Processing Equipment】The total weight of the 25-8 project in Huizhou, ranging from 2615 to 2025, is approximately 14,370 tons; the DPPB module was shipped from Qingdao, Shandong. https://bbs.hcbbs.com/thread-5698754-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Processing Equipment】From 2016 to 2025, Tianhua Institute independently developed 8 heat box systems, which were successfully deployed in ExxonMobil’s 500,000 tons per year low-density polyethylene (LDPE) production facility. https://bbs.hcbbs.com/thread-5698775-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Processing Equipment】From 2020 to 2025, Zhongkong Technology, in collaboration with Zhejiang Petrochemical, built the largest integrated refining and chemical processing project to date, setting a control point count of 770,000. https://bbs.hcbbs.com/thread-5698836-1-1.html (Source: Haichuan Chemical Industry Forum)
【History of Haichuan Chemical】50 Years Since the Establishment of Zhenhai Refining & Chemical, Sinopec’s Largest Refinery https://bbs.hcbbs.com/thread-5698859-1-1.html (Source: Haichuan Chemical Forum)
【Ten Years of Rapid Development in Chemical Engineering Equipment】2623-2025: Advanced Technologies for Removing Hardness and Improving Efficiency in Coal Chemical Industry Wastewater, developed by the Sinopec Research Institute of Petrochemistry https://bbs.hcbbs.com/thread-5698913-1-1.html (Source: Haichuan Chemical Engineering Forum)
【Ten Years of Rapid Development in Chemical Equipment】2628-2025: Purity exceeding 99.99997%! Major breakthrough achieved in natural gas helium extraction technology in our country! https://bbs.hcbbs.com/thread-5699125-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Engineering Equipment】The first intelligent painting line for offshore oil and gas equipment in China was put into use from 2029 to 2025: https://bbs.hcbbs.com/thread-5699156-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Engineering Equipment】2631-2025: High-altitude welding robots made in Chengdu with steel structures https://bbs.hcbbs.com/thread-5699236-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Engineering Equipment】2631-2025: High-altitude welding robots made in Chengdu with steel structures https://bbs.hcbbs.com/thread-5699236-1-1.html (Source: Haichuan Chemical Industry Forum)