HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Hunan Lier plans to invest 194 million yuan to expand the L-aminopropylphos project to a production capacity of 50,000 tons per year

2025-12-30View Original

Thread Content

Recently, the first public announcement regarding the environmental impact assessment for Hunan Lier Biotechnology Co., Ltd.’s project to increase its production capacity to 50,000 tons per year of L-aminopropylphosphonic acid was released. The construction unit plans to invest 194.1 million yuan in the \"Hunan Lier Biotechnology Co., Ltd. Capacity Expansion Project to 50,000 tons per year of L-aminopropylphosphonic acid\". The project is located at No. 10, Shanyan Road, Jia Shan Sub-district, Jinshi City, Hunan Province. It involves expanding the production line for L-aminopropylphosphonic acid on the existing site to an output of 50,000 tons per year, along with the installation of corresponding environmental protection facilities. Hunan Lier Biotechnology Co., Ltd. is a holding subsidiary of Lier Chemical Co., Ltd.; it was established on February 26, 2016. The company focuses on research and development in synthetic biology as well as biomanufacturing. It is a synthetic biology enterprise that engages in the development, production, and sales of intermediates for pharmaceuticals and pesticides. It possesses China’s first \"large-scale biosynthesis technology for L-aminopropylphosphonic acid\", and has the capability to handle the entire biomanufacturing process, from strain development to commercial-scale production.
Reply #22025-12-30
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2038 to 2025, Dongfang Boiler managed to achieve stable coal-ammonia combustion operation for 100 consecutive hours. https://bbs.hcbbs.com/thread-5709786-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #32025-12-31
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2029 to 2025: Domestic production of key equipment for Puguang Gas Field, China’s first high-sulfur natural gas processing facility with a capacity of 10 billion cubic meters https://bbs.hcbbs.com/thread-5709886-1-1.html (Source: Huchuan Chemical Industry Forum (Hua Hai Chuan Liu hcbbs))
Reply #42025-12-31
【HaiChuan Safety Discussion】Compilation of Hidden Dangers Around Us – with pictures and texts; everyone is welcome to participate in the discussion: https://bbs.hcbbs.com/thread-5705518-1-1.html (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
Reply #52025-12-31
【Ten Years of Rapid Development in Chemical Equipment】The pilot production base of the Hami High-Oil Coal Research Institute, covering the period 2020–2025, was officially put into use in Yiwu County. https://bbs.hcbbs.com/thread-5709304-1-1.html (Source: Haichuan Chemical Forum (HCBBS))
Reply #62025-12-31
【HaiChuan Chemical Technology Documentation】Analysis of the Causes of Overtemperature in the Air Preheating Coils of a Shift Converter Process and Corresponding Countermeasures https://bbs.hcbbs.com/thread-5709677-1-1.html (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
Reply #72025-12-31
【HaiChuan Chemical Technology Documentation】Analysis of the Causes of Overtemperature in the Air Preheating Coils of a Shift Converter Process and Corresponding Countermeasures https://bbs.hcbbs.com/thread-5709677-1-1.html (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
Reply #82025-12-31
【Ten Years of Rapid Development in Chemical Engineering Equipment】Pilot-scale success achieved for the 2941-2025 high-temperature pure-oxygen pressurized bubbling fluidized-bed biomass gasification technology unit (referred to as the “Contes furnace”) https://bbs.hcbbs.com/thread-5709917-1-1.html (Source: Haichuan Chemical Engineering Forum (HCBBS))
Reply #92025-12-31
【Ten Years of Rapid Development in Chemical Engineering Equipment】2942-2025: China’s first domestically produced 300-megawatt-class heavy-duty gas turbine put into operation https://bbs.hcbbs.com/thread-5709928-1-1.html (Source: Haichuan Chemical Engineering Forum (HCBBS))
Reply #102025-12-31
【Ten Years of Rapid Development in Chemical Equipment】The first electrocracking furnace in China was successfully put into operation at Dushanzi Petrochemical Company between 2016 and 2025. https://bbs.hcbbs.com/thread-5709248-1-1.html (Source: Haichuan Chemical Forum (HCBBS))
Reply #112025-12-31
【Ten Years of Rapid Development in Chemical Engineering Equipment】China’s first large-scale perovskite building-integrated photovoltaic demonstration project was officially connected to the power grid from 2029 to 2025. https://bbs.hcbbs.com/thread-5709550-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.