Successful primary power supply connection at Substation 190a/b of the Guangxi Huayi Energy Chemical Project

2026-01-05View Original

Thread Content

Recently, the 190a and 190b substations, which are part of the 2×200,000 tons/year EVA production units for the methanol-to-olefins and downstream processing integrated project at Guangxi Hua Yi Energy Chemical Co., Ltd., constructed by Global Sixth Construction Company, successfully passed the strict inspections carried out by the project owner. Power was supplied to these units on the first attempt, marking the full operational readiness of the plant’s power system. The entire power reception process is carried out strictly in accordance with standardized and regulated procedures. First, five full-voltage impulse tests were conducted on the 35/10 kV main transformer, with a 10-minute interval between each test. The sound, vibration, and temperature changes of the transformer were closely monitored to ensure stable operation of the equipment at its rated voltage. Subsequently, three impulse power-on tests were conducted on the 10kV bus system to verify the phase of the voltage transformers, charging tests and phase verification operations were carried out on the bus coupler, and functional tests were performed on the disturbance-free quick switching device to confirm the reliability of automatic switching of the bus coupler in the event of line voltage loss or protection activation.
Reply #22026-01-05
【Haichuan Equipment Guessing Game】Why don’t these bicycles have wheels? People I know must be really amazing! https://bbs.hcbbs.com/thread-5710458-1-1.html (Source: Haichuan Chemical Industry Forum (Hua Hai Chuan Liu hcbbs))
Reply #32026-01-06
【Ten Years of Rapid Development in Chemical Equipment】The ammonia and hydrogen storage system at Qinghai Asia Silicon Poly-Silicon Co., Ltd., a project supervised by Tianhua Institute from 2025 to 2035, was successfully commissioned in just one attempt. https://bbs.hcbbs.com/thread-5710544-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #42026-01-06
【History of Haichuan Chemicals】The Engine of Civilization: A Thousand-Year Evolution of Pumps https://bbs.hcbbs.com/thread-5710250-1-1.html (Source: Haichuan Chemicals Forum (Hua Haichuan Liu hcbbs))
Reply #52026-01-06
【Haichuan Equipment Guessing Game】Why don’t these bicycles have wheels? People I know must be really amazing! https://bbs.hcbbs.com/thread-5710458-1-1.html (Source: Haichuan Chemical Industry Forum (Hua Hai Chuan Liu hcbbs))
Reply #62026-01-06
【Ten Years of Rapid Development in Chemical Equipment】From 2954 to 2025, Hengjiu Machinery has been engaged in research and development of carbon dioxide diaphragm compressors, which have contributed to the creation of the world’s first commercial supercritical carbon dioxide power generation unit, “Chao Carbon No.1”. https://bbs.hcbbs.com/thread-5710546-1-1.html (Source: Haichuan Chemical Forum (HCBBS))
Reply #72026-01-07
【Ten Years of Rapid Development in Chemical Processing Equipment】Betel’s first domestically produced compressors equipped with anti-surge valves were successfully put into use between 2025 and 2955. https://bbs.hcbbs.com/thread-5710547-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #82026-01-08
【Ten Years of Rapid Development in Chemical Processing Equipment】2958-2025: Maoming Petrochemical becomes the first company in China’s petrochemical industry to have its extruders monitored in real time; the project was approved successfully. https://bbs.hcbbs.com/thread-5710592-1-1.html (Source: Haimen Chemical Industry Forum (HCBBS))
Reply #92026-01-09
【Ten Years of Rapid Development in Chemical Processing Equipment】2960–2025: China’s largest single-scale project for zero discharge of high-salinity wastewater – The first phase of the Jinchuan Nickel-Cobalt Heavy Metal High-Salinity Wastewater Zero-Discharge Treatment Project comes online https://bbs.hcbbs.com/thread-5710636-1-1.html (Source: HCBBS Chemical Forum)
Reply #102026-01-10
【Ten Years of Rapid Development in Chemical Engineering Equipment】The 600KW high-power magnetic levitation air compressor produced by Tianrui Heavy Industry was successfully manufactured between 2021 and 2025. https://bbs.hcbbs.com/thread-5710707-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #112026-01-10
【Ten Years of Rapid Development in Chemical Engineering Equipment】The 600KW high-power magnetic levitation air compressor produced by Tianrui Heavy Industry was successfully manufactured between 2021 and 2025. https://bbs.hcbbs.com/thread-5710707-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.