HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

The equipment for the reformate separation tower in the Jiujiang Petrochemical upgrading project has been shipped off, and all the second batch of large-scale items transported by cross-crane have arrived at the site!

2026-01-08View Original

Thread Content

On January 7, the second batch of large-scale reformation oil separation tower equipment for the Jiujiang Petrochemical upgrading project was shipped. It is reported that on January 6, with the transport ship carrying the reformate separation tower docking at China Railway Jiuqiao Terminal, all of the second batch of large-scale equipment for the 1.5 million tons per year aromatic compounds and refinery upgrading project arrived at the site successfully. Starting from December 31, 2025, the first shipment containing a disproportionation stripper and disproportionation feed/effluent heat exchangers arrived at China Railway Jiuqiao Wharf, marking the beginning of the second phase of transporting large-scale equipment via overhead cranes. This batch of cross-hooking equipment consists of 4 units, including the disproportionation stripping tower, disproportionation reactor, disproportionation feed and product heat exchangers, and reformate separation tower. Among them, the reformate separation tower was shipped in two sections. Since this batch of equipment involved multiple manufacturers, transportation coordination faced various challenges such as scattered production sites, complex alignment of delivery dates, and specific unloading requirements at the Tieluqiao Port, which significantly increased the difficulties in management and coordination. Furthermore, to ensure that this batch of critical equipment arrives safely and on time, Jiujiang Petrochemical stated that the Materials Center carried out thorough planning and scientific arrangements, while strengthening oversight of the manufacturing process. Real-time tracking of the cargo’s movement throughout the process helped overcome various challenges, ensuring that large-scale equipment arrived on time and could be unloaded from the ship promptly. It is reported that the entire transportation task was completed by February 3. Currently, all relevant parties involved in the project are working closely together to lay a solid foundation for the smooth transportation and installation of subsequent equipment.
Reply #22026-01-08
【HaiChuan Safety Discussion】Compilation of Hidden Dangers Around Us – with pictures and text; everyone is welcome to participate in the discussion: https://bbs.hcbbs.com/thread-5705518-1-1.html (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
Reply #32026-01-09
【Ten Years of Rapid Development in Chemical Processing Equipment】2959-2026**Successful development of technology for keeping natural gas compressors running without power interruption in pipeline systems https://bbs.hcbbs.com/thread-5710632-1-1.html (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
Reply #42026-01-10
【Ten Years of Rapid Development in Chemical Processing Equipment】2960–2025: China’s largest single-scale project for zero discharge of high-salinity wastewater – The first phase of the Jinchuan Nickel-Cobalt Heavy Metal High-Salinity Wastewater Zero-Discharge Treatment Project comes online https://bbs.hcbbs.com/thread-5710636-1-1.html (Source: Hainan Chemical Industry Forum (HCBBS))
Reply #52026-01-12
【Ten Years of Rapid Development in Chemical Equipment】Yanhua Chemical’s new technology for \"building five new methanol distillation towers\" from 2025 to 2026 has passed **level of appraisal** https://bbs.hcbbs.com/thread-5710884-1-1.html (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
Reply #62026-01-13
【Ten Years of Rapid Development in Chemical Equipment】The world’s first industrial unit for high-pressure dry reforming with a capacity of 100 million cubic meters passed on-site inspections from 2966 to 2026. https://bbs.hcbbs.com/thread-5710893-1-1.html (Source: Haichuan Chemical Forum (HCBBS))

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.