Thread Content
On January 6, the Yulin City Ecology and Environment Bureau issued a announcement regarding its decision to approve the environmental impact assessment document for the coal tar pretreatment and remediation project carried out by Shenmu Shengbang Chemical Co., Ltd. The coal tar pretreatment and completion project of Shenmu Shengbang Chemical Co., Ltd. is located on the vacant land within the company’s existing factory site; it involves the construction of a coal tar pretreatment facility with an annual capacity of 150,000 tons, a storage tank area, as well as various supporting facilities. The 65,510 tons per year of refined feedstock produced by this project is all fed into the existing 153,760 tons per year hydrogenation unit, thereby covering the capacity requirement for refined feedstock at that unit. The total investment for the project is 25.09 million yuan, with 1.84 million yuan allocated to environmental protection measures, accounting for 7.33% of the total investment.
【Ten Years of Rapid Development in Chemical Equipment】The bulk method ABS technology developed by Dalian University of Technology was successfully applied at Jilin Petrochemical Company from 2024 to 2026. https://bbs.hcbbs.com/thread-5710881-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Equipment】The bulk method ABS technology developed by Dalian University of Technology was successfully applied at Jilin Petrochemical Company from 2024 to 2026. https://bbs.hcbbs.com/thread-5710881-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
[Common Issues in Haichuan Pipeline Design] – A compilation post; images and text are being updated. Feel free to join the discussion: https://bbs.hcbbs.com/thread-5705828-1-1.html (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
【Ten Years of Rapid Development in Chemical Equipment】The world’s first industrial unit for high-pressure dry reforming with a capacity of 100 million cubic meters passed on-site inspections from 2966 to 2026. https://bbs.hcbbs.com/thread-5710893-1-1.html (Source: Haichuan Chemical Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Equipment】The world’s first industrial unit for high-pressure dry reforming with a capacity of 100 million cubic meters passed on-site inspections from 2966 to 2026. https://bbs.hcbbs.com/thread-5710893-1-1.html (Source: Haichuan Chemical Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Processing Equipment】The Tianjin Bohua Safety Organic Liquid Hydrogen Storage and Release Demonstration Project, 2970–2025, has been successfully put into operation. https://bbs.hcbbs.com/thread-5711046-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Processing Equipment】The first pressure relief device for flow meters in sulfur-containing gas fields in China was put into use from 2027 to 2026. https://bbs.hcbbs.com/thread-5711107-1-1.html (Source: Haichuan Chemical Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Engineering Equipment】The first 1,500-meter-class vertical pipeline underwater connector with metal sealing has been certified: 2972-2026 https://bbs.hcbbs.com/thread-5711122-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Processing Equipment】The first domestically produced helium ionization chromatograph, model 2973-2025, has been officially delivered to the high-end polyolefin project at Blue Sea New Materials. https://bbs.hcbbs.com/thread-5711129-1-1.html (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
【Ten Years of Rapid Development in Chemical Equipment】The 100% domestically produced DCS system for Sinopec’s POE plants was put into use at the Tianjin Nangang Ethylene Project, 2975–2026 https://bbs.hcbbs.com/thread-5711441-1-1.html (Source: Haichuan Chemical Forum (HCBBS))