Great Wall Energy Chemical (Ningxia) 100,000 tons/year industrial demonstration project for the chemical chain mineralization of CO2

2026-01-19View Original

Thread Content

Project Name: Sinopec Great Wall Energy Chemical (Ningxia) Co., Ltd. 100,000 tons/year CO2 Chemical Chain Mineralization Utilization Industrial Demonstration Project
Launch Date: January 19, 2026
Location: Ningxia
Industry/Project Type: Chemicals and pharmaceuticals/fuel processing such as petroleum and coal/petrochemicals
Project Owner: Sinopec Great Wall Energy Chemical (Ningxia) Co., Ltd.
Total Investment: 483 million yuan
Current Progress: Tendering for engineering design
Construction Location: Coal chemical Industry Zone C, Ningdong Energy Chemical Industry Base, Ningxia Autonomous Region
Construction Contents
Main Engineering Components: (1) New installation: 100,000 tons/year CO2 chemical chain mineralization production facility along with associated auxiliary facilities (raw material transfer unit, mineral dissolution unit, nano-calcium carbonate production unit, solution recovery unit, finished product unit, exhaust gas treatment unit, facility pipe corridors); (2) New storage and transportation facilities: finished product warehouse, crude product temporary storage area, as well as the plant’s process and heating pipelines ; (3) Construction of new supporting utility facilities: air compressor stations, production wastewater tanks, substations, on-site cabinet rooms, heat exchange stations, etc., as well as demolition, renovation, and reinforcement using existing facilities ; (4) Construction of new electrical, instrumentation, communication, general layout, water supply and drainage, fire protection systems, etc.; as well as demolition, connection, interface integration, renovation, capacity expansion, and cabinet combination using existing facilities ; (5) For other utility systems such as water, steam, and wind, reliance is placed on upgrading existing facilities or building new transmission and connection facilities, with any insufficient capacity being made up through supplementary measures. Progress Milestone: January 14, 2026 – Sinopec Great Wall Energy Chemical (Ningxia) Co., Ltd.: Tender announcement for Phase 1 of the 100,000 tons/year industrial demonstration project for the chemical chain mineralization of CO2 – Engineering detailed design + procurement + construction (EPC) (Engineering design tender)
Reply #22026-01-19
【Ten Years of Rapid Development in Chemical Processing Equipment】From 2025 to 2036, the first industrial control system in the petrochemical industry, with 100% domestically produced software and hardware, was successfully put into use in complex petrochemical plants. https://bbs.hcbbs.com/thread-5711442-1-1.html (Source: HaiChuan Chemical Industry Forum (HCBBS))
Reply #32026-01-19
【3D Process Flow】Summary Post – Useful for learning about the process flow: https://bbs.hcbbs.com/thread-5711616-1-1.html (Source: Haimen Chemical Industry Forum (HCBBS))
Reply #42026-01-19
【Ten Years of Rapid Development in Chemical Processing Equipment】From 2025 to 2036, the first industrial control system in the petrochemical industry, with 100% domestically produced software and hardware, was successfully put into use in complex petrochemical plants. https://bbs.hcbbs.com/thread-5711442-1-1.html (Source: HaiChuan Chemical Industry Forum (HCBBS))
Reply #52026-01-20
【Ten Years of Rapid Development in Chemical Equipment】2978–2026: China’s First “Lighthouse Factory” in the Global Fiber Industry Established by Huafeng Chongqing Spandex https://bbs.hcbbs.com/thread-5711458-1-1.html (Source: Haichuan Chemical Forum (HCBBS))
Reply #62026-01-20
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2029 to 2026, CNOOC Engineering’s first intelligent acoustic imaging inspection system was put into use for high-pressure airtightness testing of the process pipelines at Shell’s project in Nigeria. https://bbs.hcbbs.com/thread-5711490-1-1.html (Source: Hchuan Chemical Forum (Hchuanliu hcbbs))
Reply #72026-01-20
【HaiChuan Safety Discussion】Compilation of Hidden Dangers Around Us – with pictures and texts; everyone is welcome to participate in the discussion: https://bbs.hcbbs.com/thread-5705518-1-1.html (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
Reply #82026-01-21
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2029 to 2026, CNOOC Engineering’s first intelligent acoustic imaging inspection system was put into use for high-pressure airtightness testing of the process pipelines at Shell’s project in Nigeria. https://bbs.hcbbs.com/thread-5711490-1-1.html (Source: Hchuan Chemical Forum (Hchuanliu hcbbs))
Reply #92026-01-21
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2021 to 2026, Guoneng Group’s project on \"Research on Key Technologies for Converting Desalinated Brine into Salt and Development of Pilot-Scale Facilities\" was successful in producing salt. https://bbs.hcbbs.com/thread-5711638-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #102026-01-23
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2021 to 2026, Guoneng Group’s project on \"Research on Key Technologies for Converting Desalinated Brine into Salt and Development of Pilot-Scale Facilities\" was successful in producing salt. https://bbs.hcbbs.com/thread-5711638-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #112026-01-24
【Ten Years of Rapid Development in Chemical Engineering Equipment】Breakthrough achieved in China’s first offshore membrane carbon removal demonstration project: the associated gas recovery, carbon removal, and carbon dioxide sequestration project at the Huizhou 32-5 platform, 2982-2026 https://bbs.hcbbs.com/thread-5711847-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.