At 18:32 on January 13, the epoxidation reactor 2100-R-1101E for the refinery transformation and upgrading as well as ethylene quality improvement project at the Maoming branch was lifted into place. This equipment weighs approximately 460 tons, has a diameter of 4.8 meters and a height of 15.9 meters; it is one of the key process equipment in this project. To ensure the safe and orderly conduct of lifting operations, the Fangyuan supervision team took preemptive measures and exercised strict control: on one hand, it carefully reviewed the special construction plans and organized expert evaluations to guarantee their scientific validity and feasibility ; On the other hand, a thorough inspection is carried out on the levelness of the lifting site, the performance parameters of the lifting equipment, the safety condition of the rigging, and the qualification certificates of the operators, to ensure that all safety measures are properly implemented. During the lifting process, a special supervision team composed of Project Director Zhou Meng, General Manager Ya Fu, Chief Safety Officer Luo Jirong, Safety Supervision Engineer Cao Huaping, and Equipment Installation Engineer Li Guanqian was formed to provide on-site supervision throughout the entire process. Pay close attention to key aspects such as the lifting sequence, lifting speed, control of the object’s position in the air, and positioning accuracy. With the overall coordination by the project owner, careful organization by the construction unit, full-process supervision by the supervision unit, and close cooperation from all relevant parties, the entire lifting process proceeded smoothly and orderly, with successful placement in just one attempt.
【3D Process Flow】Summary Post – Useful for learning about the process flow: https://bbs.hcbbs.com/thread-5711616-1-1.html (Source: Haimen Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2021 to 2026, Guoneng Group’s project on \"Research on Key Technologies for Converting Desalinated Brine into Salt and Development of Pilot-Scale Facilities\" was successful in producing salt. https://bbs.hcbbs.com/thread-5711638-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【HaiChuan Safety Discussion】Compilation of Hidden Dangers Around Us – with pictures and texts; everyone is welcome to join the discussion: https://bbs.hcbbs.com/thread-5705518-1-1.html (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
【Ten Years of Rapid Development in Chemical Engineering Equipment】Breakthrough achieved in China’s first offshore membrane carbon removal demonstration project: the associated gas recovery, carbon removal, and carbon dioxide sequestration project at the Huizhou 32-5 platform, 2982–2026 https://bbs.hcbbs.com/thread-5711847-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Engineering Equipment】Breakthrough achieved in China’s first offshore membrane carbon removal demonstration project: the associated gas recovery, carbon removal, and carbon dioxide sequestration project at the Huizhou 32-5 platform, 2982–2026 https://bbs.hcbbs.com/thread-5711847-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Engineering Equipment】Breakthrough achieved in China’s first offshore membrane carbon removal demonstration project: the associated gas recovery, carbon removal, and carbon dioxide sequestration project at the Huizhou 32-5 platform, 2982–2026 https://bbs.hcbbs.com/thread-5711847-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Equipment】From 2025 to 2036, the first industrial control system for the petrochemical industry, with 100% domestically produced software and hardware, was successfully put into use in complex petrochemical plants. https://bbs.hcbbs.com/thread-5711442-1-1.html (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
【Ten Years of Rapid Development in Chemical Equipment】From 2983 to 2026: Jiangsu Qidong produces the world’s largest 30,000-cubic-meter land-based liquefied petroleum gas storage tank, which is then shipped overseas. https://bbs.hcbbs.com/thread-5712041-1-1.html (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
【Ten Years of Rapid Development in Chemical Processing Equipment】2984-2026: Domestic production and use of rotary valves, key components in aromatic hydrocarbon adsorption and separation units at Shanghai Petrochemical Company https://bbs.hcbbs.com/thread-5712074-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))