Shandong Dongming Petrochemical Group Co., Ltd.’s 15 million tons per year integrated refining and chemical processing project

2026-01-23View Original

Thread Content

15 million tons per year integrated refining and chemical project. Owner: Shandong Dongming Petrochemical Group Co., Ltd. Location of construction: Heze, Shandong. Investment amount: 73.8 billion yuan. Project progress: Procedures for approval are underway. Project overview: Adhering to the strategic directions of \"high-end development, sustainability, intelligence, and integration,\" this project aims to create a leading integrated industrial base in China for the entire value chain ranging from crude oil to olefins, aromatics, and high-end new materials. The newly established crude oil processing facility will have a capacity of 15 million tons per year, with 36 process units and complete auxiliary facilities built to support it. This will create a full industrial chain that spans from crude oil to basic raw materials, followed by olefins/aromatics, and ultimately high-end chemical new materials; the proportion of chemical products in this output will increase from 45% to over 60%. Expected commissioning date: 4th quarter of 2028
Reply #22026-01-23
【3D Process Flow】Summary Post – Useful for learning about the process flow: https://bbs.hcbbs.com/thread-5711616-1-1.html (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
Reply #32026-01-24
【Ten Years of Rapid Development in Chemical Engineering Equipment】Breakthrough achieved in China’s first offshore membrane carbon removal demonstration project: the associated gas recovery, carbon removal, and carbon dioxide sequestration project at the Huizhou 32-5 platform, 2982–2026 https://bbs.hcbbs.com/thread-5711847-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #42026-01-24
【Ten Years of Rapid Development in Chemical Equipment】From 2025 to 2036, the first industrial control system for the petrochemical industry, with 100% domestically produced software and hardware, was successfully put into use in complex petrochemical plants. https://bbs.hcbbs.com/thread-5711442-1-1.html (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
Reply #52026-01-24
【HaiChuan Safety Discussion】Compilation of Hidden Dangers Around Us – with pictures and texts; everyone is welcome to join the discussion: https://bbs.hcbbs.com/thread-5705518-1-1.html (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
Reply #62026-01-25
【Ten Years of Rapid Development in Chemical Equipment】From 2983 to 2026: Jiangsu Qidong produces the world’s largest 30,000-cubic-meter land-based liquefied petroleum gas storage tank, which is then shipped overseas. https://bbs.hcbbs.com/thread-5712041-1-1.html (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
Reply #72026-01-25
【Ten Years of Rapid Development in Chemical Equipment】2984-2026: Domestic production and application of rotary valves, key components in aromatic hydrocarbon adsorption and separation units at Shanghai Petrochemical Company https://bbs.hcbbs.com/thread-5712074-1-1.html (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
Reply #82026-01-26
【Ten Years of Rapid Development in Chemical Processing Equipment】From 2987 to 2026, Weifang Gaomi Haomai delivered multi-axis centrifugal compressors capable of handling 180,000 standard cubic meters of air. https://bbs.hcbbs.com/thread-5712097-1-1.html (Source: Haimen Chemical Industry Forum (HCBBS))
Reply #92026-01-26
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2029 to 2026, CNOOC Engineering’s first intelligent acoustic imaging inspection system was put into use for high-pressure airtightness testing of the process pipelines at Shell’s project in Nigeria. https://bbs.hcbbs.com/thread-5711490-1-1.html (Source: Hachuan Chemical Industry Forum (HCBBS))
Reply #102026-01-26
【Ten Years of Rapid Development in Chemical Equipment】The world’s first industrial production facility for the polyphase hydroformylation of ethylene using single-atom catalysts was put into operation between 2017 and 2020. https://bbs.hcbbs.com/thread-5711445-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #112026-01-27
【Ten Years of Rapid Development in Chemical Equipment】2988-2026: “Robots + AI”! Hangyang Group’s \"Intelligent On-site Inspection Management System for Air Separation Units\" has been put into full use: https://bbs.hcbbs.com/thread-5712099-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.