Thread Content
Recently, the **Pilot-scale Process Verification and Optimization Project for Coal-based Polyolefin Elastomers by Ningxia Coal Industry Co., Ltd., a subsidiary of the Energy Group, was approved for registration. According to reports from January, **Ningxia Coal Industry Company, part of the Energy Group, successfully completed the entire process for its 10,000-ton capacity α-olefin separation unit during a single trial run. The unit produced 1-hexene of polymer-grade purity exceeding 99% and 1-octene of purity over 98%. This achievement marks a significant breakthrough in China’s field of separating high-value chemical raw materials derived from coal, it extends the industrial chain related to α-olefins obtained through coal indirect liquefaction, and it lays a solid foundation for the development of downstream industries such as polyolefin elastomers and metallocene polyα-olefins. The project was launched in 2019. After 6 years of effort, the R&D team developed an \"extraction distillation/catalytic distillation\" separation process, overcoming technical challenges such as the deep deoxygenation of Fischer-Tropsch oil, the separation of alkanes and alkenes with the same carbon count, and the purification of high-purity α-alkenes. They moved from single-point experiments to the integration of the entire process technology, thereby creating a set of α-alkene separation processes with independent intellectual property rights. It is reported that the device has passed the 72-hour performance test organized by the China Petroleum and Chemical Industry Federation. The separation process route for α-olefins features a reasonable flow, a feasible scheme, and reliable technology. The successful commissioning of this facility provides the core technical support for the industrial production of 1-hexene and 1-octene on a 100,000-ton scale via FTO process.
【Ten Years of Rapid Development in Chemical Engineering Equipment】Breakthrough achieved in China’s first offshore membrane carbon removal demonstration project: the associated gas recovery, carbon removal, and carbon dioxide sequestration project at the Huizhou 32-5 platform, 2982–2026 https://bbs.hcbbs.com/thread-5711847-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【HaiChuan Safety Discussion】Compilation of Hidden Dangers Around Us – with pictures and texts; everyone is welcome to join the discussion: https://bbs.hcbbs.com/thread-5705518-1-1.html (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
【Ten Years of Rapid Development in Chemical Equipment】2984-2026: Domestic production and use of rotary valves, key components in aromatic hydrocarbon adsorption and separation units at Shanghai Petrochemical Company https://bbs.hcbbs.com/thread-5712074-1-1.html (Source: Haichuan Chemical Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Processing Equipment】From 2987 to 2026, Weifang Gaomi Haomai delivered multi-axis centrifugal compressors capable of handling 180,000 standard cubic meters of air. https://bbs.hcbbs.com/thread-5712097-1-1.html (Source: HCHBBS Chemical Forum)
【Ten Years of Rapid Development in Chemical Equipment】From 2026 to 2036, Tianhua Institute independently designed and manufactured the world’s first set of horizontal polycondensers for nylon 66; the 100,000-ton/year nylon 66 production facility at Liaoyang Petrochemical was brought online successfully in just one attempt. https://bbs.hcbbs.com/thread-5712094-1-1.html (Source: Haichuan Chemical Forum (HCBBS))
【3D Process Flow】Summary Post – Useful for learning about the process flow: https://bbs.hcbbs.com/thread-5711616-1-1.html (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
【Ten Years of Rapid Development in Chemical Equipment】2988-2026: “Robots + AI”! Hangyang Group’s \"Intelligent On-site Inspection Management System for Air Separation Units\" has been put into full use: https://bbs.hcbbs.com/thread-5712099-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Equipment】2988-2026: “Robots + AI”! Hangyang Group’s \"Intelligent On-site Inspection Management System for Air Separation Units\" has been put into full use: https://bbs.hcbbs.com/thread-5712099-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Engineering Equipment】China’s first heat network return water recycling-based geothermal heat pump combined heating project was put into operation in Beijing from 2990 to 2026. https://bbs.hcbbs.com/thread-5712221-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))