Thread Content
Recently, the Long Son low-temperature storage tank project in Vietnam, which was jointly general contracted by China National Chemical Corporation Tianchen and Vietnam Petroleum Technology Services Company, successfully completed the pneumatic jacking of all the large-scale low-temperature storage tanks. This milestone was achieved 43 days ahead of the original schedule, indicating that the most critical and technically challenging installation phases of the project have been completed safely, with high quality and efficiency. As a result, the project progress is now on fast track, securing valuable time for the subsequent construction steps. Gas head lifting in low-temperature storage tanks is a critical process in the construction of large-scale low-temperature storage tanks, characterized by high technical complexity and strict safety requirements. This project involves two storage tanks with a capacity of 120,000 cubic meters each; their dome structures are very large, and the lifting process requires millimeter-level precision and stability control, which imposes high demands on construction organization and technical management. Leveraging its extensive technical expertise and proven engineering experience, Tianchen Company’s project team quickly replicated and optimized the successful methods used for the first air-jacking operation, enabling continuous work and repeated successes. This demonstrates Tianchen Company’s strong capabilities in organizing the construction of complex large-scale equipment systems, ensuring standardized operations, as well as maintaining control over safety and quality. Since the project began, facing various challenges such as a complex construction environment in overseas projects and difficulties in resource allocation, the project team maintained a high level of determination, adhering to the principle that \"the start is the moment of sprinting, and the beginning is the stage of decisive action.\" By making full use of the advantages of EPC turnkey management, they carried out systematic planning and careful organization. Through lean management and proactive resource allocation, they managed to combine two key milestones, and completed all the large-scale lifting operations for the low-temperature storage tanks at high quality and efficiency, in line with the \"Tianchen speed.\"
【Ten Years of Rapid Development in Chemical Equipment】2984-2026: Domestic production and application of rotary valves, key components in aromatic hydrocarbon adsorption and separation units at Shanghai Petrochemical Industry https://bbs.hcbbs.com/thread-5712074-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【HaiChuan Safety Discussion】--Absence of DN65 size test pipes and drainage measures on the outlet pipes of enterprise fire pumps https://bbs.hcbbs.com/thread-5712095-1-1.html (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2029 to 2026, CNOOC Engineering’s first intelligent acoustic imaging inspection system was put into use for high-pressure airtightness testing of the process pipelines at Shell’s project in Nigeria. https://bbs.hcbbs.com/thread-5711490-1-1.html (Source: Hchuan Chemical Industry Forum (Hchuanliu hcbbs))
【Ten Years of Rapid Development in Chemical Equipment】From 2026 to 2036, Tianhua Institute successfully designed and manufactured the world’s first set of horizontal polyconders for nylon 66; the 100,000-ton/year nylon 66 production facility at Liaoyang Petrochemical was brought online successfully in just one attempt. https://bbs.hcbbs.com/thread-5712094-1-1.html (Source: Haichuan Chemical Forum (HCBBS))
【3D Process Flow】Summary Post – Useful for learning about the process flow: https://bbs.hcbbs.com/thread-5711616-1-1.html (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
【Ten Years of Rapid Development in Chemical Equipment】2978–2026: The first “Lighthouse Factory” in the global fiber industry is established by Huafeng Chongqing Spandex https://bbs.hcbbs.com/thread-5711458-1-1.html (Source: Haichuan Chemical Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Equipment】2988-2026: “Robots + AI”! Hangyang Group’s \"Intelligent On-site Inspection Management System for Air Separation Units\" has been put into full use: https://bbs.hcbbs.com/thread-5712099-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Equipment】2988-2026: “Robots + AI”! Hangyang Group’s \"Intelligent On-site Inspection Management System for Air Separation Units\" has been put into full use: https://bbs.hcbbs.com/thread-5712099-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Engineering Equipment】China’s first heat network return water recycling-based heat pump heating project was put into operation in Beijing from 2990 to 2026. https://bbs.hcbbs.com/thread-5712221-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Engineering Equipment】2991-2026: SHENGU’s world’s first large-flow centrifugal steam compressor was successfully tested https://bbs.hcbbs.com/thread-5712284-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))