Thread Content
On January 22, a public announcement was made regarding the approval of the safety improvement and renovation project for the factory of Changshu SAIAFU Fluorine Chemical Co., Ltd., which is designed to increase the annual production capacity to 40 tons of sodium hypochlorite, hydrogen fluoride, and liquid chlorine. The details of the project are as follows: Project name: Safety improvement and renovation project for the factory of Changshu SAIAFU Fluorine Chemical Co., Ltd., aiming to increase annual production capacity to 40 tons of sodium hypochlorite, hydrogen fluoride, and liquid chlorine; Construction unit: Changshu Sanaifu Fluorine Chemical Co., Ltd ; Construction location: Within the existing factory premises of Changshu Sainfu Fluorine Chemical Co., Ltd., located at No. 2 Changyu Road, Changshu New Materials Industrial Park, Haiyu Town, Changshu City, Suzhou ; Project nature: Renovation ; Total investment: 44.8 million yuan ; Construction scale and scope: This project is a safety improvement and renovation initiative for the plant of Changshu SAAFU Fluorine Chemical Co., Ltd., which is designed to increase the annual production capacity to 40 tons of sodium hypochlorite, hydrogen fluoride, and liquid chlorine. No new land will be allocated for this purpose; the construction will take place using the existing facilities of Changshu SAAFU Fluorine Chemical Co., Ltd. The project aims to build a production facility capable of producing 40 tons of sodium hypochlorite per year, as well as to carry out safety upgrades to the existing hydrogen fluoride storage area and liquid chlorine warehouse. The specific construction details are as follows: (1) A new sodium hypochlorite production facility is to be constructed within the buildings used for storing hydrogen fluoride and liquid chlorine. The raw materials for producing sodium hypochlorite will consist of some of the liquid chlorine stored in the liquid chlorine tanks after these upgrades, along with a small amount of liquid chlorine remaining in the transfer pipes during tank replacement, as well as nitrogen-rich chlorine gas. Sodium hypochlorite will be generated using the principle of alkaline absorption, and then sold externally. (2) Plan to demolish some powder warehouses (Class D); after construction, demolish the AHF tank farm, and reuse the liquid caustic tank farm ; A new facility for hydrogen fluoride and liquid chlorine will be constructed (2 floors/Part 3 floors, Category B; floor area of 1167.42 m2, building area of 2398.24 m2). It will be equipped with a sodium hypochlorite production unit, 4 hydrogen fluoride storage tanks with a capacity of 100 m3 each (including 1 emergency tank for hydrogen fluoride), 2 hydrogen fluoride feeding tanks with a capacity of 31 m3 each, 3 liquid chlorine storage tanks with a capacity of 50 m3 each (including 1 emergency tank for liquid chlorine), 3 sodium hypochlorite circulation tanks, as well as related pumps. Upon completion of this project, Changshu Sanaifu Fluorine Chemical Co., Ltd. plans to establish a production capacity of 40 tons per year of sodium hypochlorite. Anhydrous hydrogen fluoride and liquid chlorine currently stored in the factory area will be moved to the newly built facilities for hydrogen fluoride and liquid chlorine, while the existing liquid chlorine warehouse will cease to be used for that purpose and will instead be utilized as auxiliary space.
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2029 to 2026, CNOOC Engineering’s first intelligent acoustic imaging inspection system was put into use for high-pressure airtightness testing of the process pipelines at Shell’s project in Nigeria. https://bbs.hcbbs.com/thread-5711490-1-1.html (Source: Huchuan Chemical Forum (Hua Hai Chuan Liu hcbbs))
【HaiChuan Safety Discussion】Compilation of Hidden Dangers Around Us – with images and text; everyone is welcome to participate in the discussion: https://bbs.hcbbs.com/thread-5705518-1-1.html (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
【Ten Years of Rapid Development in Chemical Equipment】From 2026 to 2036, Tianhua Institute independently designed and manufactured the world’s first set of horizontal polycondensers for nylon 66; the 100,000-ton/year nylon 66 production facility at Liaoyang Petrochemical was brought online successfully in just one attempt. https://bbs.hcbbs.com/thread-5712094-1-1.html (Source: Haichuan Chemical Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Equipment】The world’s first industrial production facility for the polyphase hydroformylation of ethylene using single-atom catalysts was put into operation between 2017 and 2020. https://bbs.hcbbs.com/thread-5711445-1-1.html (Source: HCBBS Chemical Forum)
【Ten Years of Rapid Development in Chemical Equipment】2978-2026: China’s First “Lighthouse Factory” in the Global Fiber Industry Established by Huafeng Chongqing Spandex https://bbs.hcbbs.com/thread-5711458-1-1.html (Source: Haichuan Chemical Forum (Hua Hai Chuan Liu hcbbs))
【Ten Years of Rapid Development in Chemical Equipment】2988-2026: “Robots + AI”! Hangyang Group’s \"Intelligent On-site Inspection Management System for Air Separation Units\" has been put into full use: https://bbs.hcbbs.com/thread-5712099-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Equipment】2988-2026: “Robots + AI”! Hangyang Group’s \"Intelligent On-site Inspection Management System for Air Separation Units\" has been put into full use: https://bbs.hcbbs.com/thread-5712099-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Engineering Equipment】Key technologies for the efficient co-production of synthetic ammonia and LNG from smokeless pulverized coal, 2989–2026, have been approved for use. https://bbs.hcbbs.com/thread-5712191-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Engineering Equipment】China’s first heat network return water recycling-based heat pump combined heating project was put into operation in Beijing from 2990 to 2026. https://bbs.hcbbs.com/thread-5712221-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Engineering Equipment】2991–2026: SHENGU’s world’s first large-flow centrifugal steam compressor was successfully tested https://bbs.hcbbs.com/thread-5712284-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))