The installation of 8 large-scale towers for the Hebei HNA Petrochemical project has been successfully completed!

2026-02-06View Original

Thread Content

The installation of 8 large-scale towers for the Hebei HNA Petrochemical project has been successfully completed! Recently, with the final tower accurately installed, the 800,000-ton per year butyl octanol production project at Hebei HNA Petrochemical, undertaken by the Fourth Engineering Company of China National Chemical 14th Construction Corporation, has successfully completed the installation of all 8 large-scale towers. It is reported that the lifting operations began on January 8 and lasted for 25 days; the tallest tower component reached 85 meters, marking the full transition of the project to a new phase focused on equipment installation and commissioning. On site, the project team utilized a combined approach involving a 750-ton crawler crane and a 500-ton truck crane to organize the work in an efficient manner. During the 25-day continuous operation, the team effectively mitigated the effects of the severe cold by using equipment resistant to low temperatures and optimizing the working hours ; By relying on precise calculations and real-time monitoring, the lifting errors of the 85-meter-tall tower are kept within the design limits ; By optimizing the coordinated command of multiple cranes and daily construction scheduling, it was successfully possible to overcome the challenges associated with precise positioning at great heights and the simultaneous execution of multiple tasks on the ground. Throughout the entire lifting process, the principle of giving top priority to safety and quality was upheld at all times. Technical personnel and supervisors were present to oversee the process throughout, ensuring closed-loop control over every stage; as a result, all lifting tasks were completed safely, with high quality and efficiency.
Reply #22026-02-06
【HaiChuan Safety Discussion】Compilation of Hidden Dangers Around Us – with pictures and texts; everyone is welcome to participate in the discussion: https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5705518 (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
Reply #32026-02-07
【Ten Years of Rapid Development in Chemical Processing Equipment】The world’s first industrial demonstration plant for high-pressure methane-carbon dioxide dry reforming was successfully put into operation from 2030 to 2026. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5712818 (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #42026-02-08
【Haichuan Spring Festival Teahouse】Old items seen when returning to one’s hometown – do you recognize them? (16)--Warm memories of winter in the south https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5712746 (Source: Haichuan Chemical Industry Forum (Hua Hai Chuan Liu hcbbs))
Reply #52026-02-09
【Haichuan Spring Festival Tea House】Old items seen upon returning to one’s hometown – do you recognize them? (41) Looking forward to a bountiful harvest in autumn https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5713402 (Source: Haichuan Chemicals Forum (Hua Haichuan Liu hcbbs))
Reply #62026-02-10
【Ten Years of Rapid Development in Chemical Equipment】China’s first gigawatt-class AEM film production line went into mass production from 2030 to 2026 https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5713037 (Source: Haichuan Chemical Forum (Hua Hai Chuan Liu hcbbs))
Reply #72026-02-11
【Ten Years of Rapid Development in Chemical Engineering Equipment】The complete set of technologies for producing magnesium-based solid hydrogen storage materials with independent intellectual property rights in China has passed the evaluation process. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5713092 (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #82026-02-11
【Ten Years of Rapid Development in Chemical Engineering Equipment】The project aimed at localizing major equipment at the Beijing Aerospace Power Research Institute, titled “LNG Storage Tank Top Relief Valve”, for the period 2009–2026, has been approved. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5713103 (Source: Haichuan Chemical Industry Forum (HCBBS))

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.