Recommendations for domestic natural gas pipeline projects in 2026

2026-03-03View Original

Thread Content

Since 2026, with the official implementation of the \"Regulations on the Planning, Construction, and Operation of Oil and Gas Infrastructure\", as well as the **Energy Administration’s efforts to continuously improve a unified national network for natural gas pipelines**, there has been a surge in the construction of natural gas pipelines across the country. Recently, 20 key projects have been advanced at a rapid pace, covering 12 provinces including Zhejiang, Chongqing, Shaanxi, Jilin, and Hebei. These projects involve various aspects such as the construction of main lines, the extension of branch lines, and upgrades and optimizations, with a total investment amount exceeding 40 billion yuan having been disclosed. 1. Hangzhou Natural Gas Utilization Project S16-1 (Section Affected by the Hangchun-Kai Expressway Project): High-pressure natural gas pipeline relocation project. This project is located in Fuyang District, Hangzhou City, Zhejiang Province, and is funded and constructed by Hangzhou Natural Gas Co., Ltd. High-pressure natural gas pipeline relocation project for Hangzhou Natural Gas Utilization Project S16-1 (the section affected by the Hangzhou-Chun’an Expressway project). The total investment for the project is 88.63 million yuan. 2. The Jiangdong to Jiaoshi natural gas pipeline relocation project on the Wowang Line. This project is located in Jiangdong Sub-district and Jiaoshi Town, Fuling District, Chongqing, and is funded and constructed by Chongqing Jianfeng Chemical Co., Ltd. The pipeline starts from the pipe connection behind the south valve room at Station 3, crosses the Shanghai-Chongqing Expressway, and passes through Jingpan Village, Daozhuang Village, Daxi Village, Taiyang Village, Qingyun Village, Tianfu Village, and Yuquan Village. It reaches a point about 220 meters south of the under-construction Tiantai Wellness Center, where it connects with an existing pipeline. The pipeline avoids urban areas, the Sulou Nature Reserve, and the Yutai Mountain Scenic Area; the length of the pipeline that needs to be rerouted is 15.5 km. Design pressure: 3.92 MPa. The total investment for the project is 66.1199 million yuan.
Reply #22026-03-03
3. Rui’anxi-Wencheng Branch Natural Gas Pipeline Project: This project is located in Rui’an City, Pingyang County, and Wencheng County of Wenzhou City, Zhejiang Province, and was invested in and constructed by Zhejiang Zhenneng Natural Gas Pipeline Network Co., Ltd. A new Rui’anxi-Wencheng branch line will be constructed, with a total length of approximately 37.6 km. The design pressure is 6.3 MPa, and the pipe diameter is 323.9 mm. The designed annual throughput of the pipeline is 0.77×108 Nm3/year, and the designed daily throughput is 30.6×104 Nm3/day. No internal coating is applied along the entire line; there are 2 gas transmission stations, namely the Rui’an West Distribution Station and the Wencheng Terminal Station. The Ryanxi transfer station is built jointly with Valve Room 3 of the Zhejiang-Fujian branch line of Line 2, while the Wencheng terminal station is a newly constructed facility. One monitoring valve room is installed along the entire line (Tengjiao Valve Room). The main functions of the Ryanxi transfer station include pig launching, filtering, metering, pressure regulation, and venting, while the Wencheng terminal station’s main functions are pig receiving, filtering, pressure regulation, metering, and venting. The total investment for the project is 402.62 million yuan. 4. Sui De to Wu Bao Natural Gas Pipeline Project of Shaanxi Natural Gas Co., Ltd. This project is located in Sui De County, Yulin City, Shaanxi Province, and was invested in and constructed there. The total length of the pipeline is approximately 26.5 km, with a pipe diameter of D273 mm. The design pressure is 6.3 MPa, and the designed gas transmission capacity is 66.6×104 Nm3/d. The pipeline is constructed from L290 NPSL2 seamless steel pipes; for external anti-corrosion protection, a three-layer PE reinforced anti-corrosion coating (3PE) is used, while double-layer epoxy powder coating is applied to the thermally bent sections of the pipeline. There is 1 gas transmission station along the line, as well as 1 line isolation valve room. The line crosses 10 provincial highways and 1 railway along its route. For the cathodic protection of pipeline systems, forced current cathodic protection is used, while sacrificial anode protection is employed for the buried pipelines at the stations. Among them, it is 19 km in Suide County of Yulin City and 7.5 km in Wubao County. The project investment amount is unknown.
Reply #32026-03-03
5. Hantai District Gasification of Hanzhong Project (Resolving gas supply issues and replacing cylinders with pipes) – Natural gas pipeline construction project (third batch). This project is located on the 7th floor at No. 252, Minzhu Street, Hantai District, Hanzhong City, Shaanxi Province, and it is funded and constructed by the Urban Management Bureau of Hantai District, Hanzhong City. The Longjiang Sub-district Office’s jurisdiction lacks the construction of a gas main network as well as a low-pressure network for converting household cylinders to pipes. Specifically: 11.83 kilometers of medium-pressure natural gas pipelines were laid, using PE100SDR11 pipes; among these, the length of DE200 pipes was 1818 meters, the length of DE160 pipes was 1504 meters, the length of DE110 pipes was 6013 meters, the length of DE90 pipes was 1822 meters, and the length of DE63 pipes was 668 meters. 130.95 kilometers of low-pressure overhead pipelines were installed, using steel pipes with diameters ranging from DN15 to DN50. There are 7164 households served by these systems, along with auxiliary structures such as inspection wells. The total investment for the project is 87.44 million yuan. 6. Changchun–Shijiazhuang Gas Pipeline Project (Phase 3): This project is located in Changchun City, Jilin Province, and Shijiazhuang City, Hebei Province, and is invested in and constructed by **Pipeline Group Northern Pipeline Co., Ltd.** 1,373 km of new pipelines were constructed, including 288 km for the Changbai-Wu branch line, 303 km for the Panchi connection line, 62 km for the Fuxin branch line, 16 km for the Yixian branch line, 470 km for the Zhangcheng branch line, 77 km for the Xinglong branch line, 21 km for the Pingquan branch line, and 136 km for the Dingxing connection line. The total investment for the project is 2,198,910 million yuan.
Reply #42026-03-03
7. Phase II pipeline project of the Zhaotong branch natural gas pipeline project (Xuanhui Expressway) relocation and renovation project. This project is located in Xuanwei City and Huize County, Qujing City, Yunnan Province, and is invested in and constructed by Qujing Nengtou Natural Gas Industry Development Co., Ltd. The Phase II project of the Zhaotong branch natural gas pipeline project (Xuanhui Expressway) involves the relocation of natural gas pipelines related to the expressway project, with 2 sections in total. The project investment amount is unknown. 8. Zhouning Branch Line of Natural Gas Pipeline Project (Fuan to Zhouning Section) (Long-distance Natural Gas Pipeline Project from Fuan to Zhouning). This project is located in Zhouning County, Ningde City, Fujian Province, and is funded and constructed by the Zhouning County Bureau of Housing and Urban-Rural Development. 1. It is planned to construct a 48-kilometer long pipeline from Zhouning to Fu’an, with a pressure of 4.0 MPA. 2. It is planned to build an 8-kilometer pipeline from Zhouningmen Station to Lidun, plus a 6-kilometer pipeline in Liping; in total, this amounts to 14 kilometers, with a pressure of 2.0 MPA. 3. One substation in Zhouning will be constructed, covering an area of 10 mu. 4. Two high- and medium-pressure voltage regulation cabinets will be built, occupying an area of 0.4 mu. The total investment for the project is 513.2 million yuan.
Reply #52026-03-03
9. Wanhua Chemical Green Power Industrial Park Natural Gas Pipeline Project: This project is located in Haiyang, Yantai City, Shandong Province, and was invested in and constructed by Wanhua Chemical (Haiyang) Battery Materials Technology Co., Ltd. Wanhua Chemical Green Power Industrial Park natural gas pipeline project. The total investment for the project is currently unknown. 10. Xintai Natural Gas Pipeline Project (Phase II) by Jitai Gas Co., Ltd., Changling County. This project is located in Changling County, Songyuan City, Jilin Province, and is funded and constructed by Jitai Gas Co., Ltd., Changling County. The total length of the pipelines for this project is 45,019 m, with a design pressure of 1.6 MPa and a pipe diameter of D168 mm. Natural gas is supplied from the Sihet Village Comprehensive Station; the supply volume to COFCO Feed Factory is 5,000 Nm3/day (1.825 million Nm3/year), while the supply volume to COFCO pig farming farms is 30,000 Nm3/day (10.95 million Nm3/year). The comprehensive station in Sihé Village, Xin’an Town, Jitai Gas Co., Ltd. in Changling County has been completed; its capacity is to process 100,000 cubic meters of natural gas per day. The total gas transmission volume for this project is 35,000 cubic meters per day; therefore, this project can rely on the Sihetown Comprehensive Station. The project investment amount is 150 million yuan.
Reply #62026-03-03
11. Xinhui Daze Gas-Heat Power Project – Natural gas pipeline and supporting facilities project. This project is located in Xinhui District, Jiangmen City, Guangdong Province, and is invested in and constructed by Jiangmen Huapu Energy Co., Ltd. The pipelines of this project are divided into two sections, with a total length of approximately 7.9 km (3 km in Heshan section and 4.9 km in Xinhui section). Among them, the length of the Gonghe valve chamber-Gonghe distribution station section is 0.47 km; the pipeline uses φ273.1×11.1 specifications, with a design pressure of 9.2 MPa, and the steel pipe material is L360N ; The length of the section from the Republican Distribution Station to the Oozawa Power Plant is 7.43 km. The pipeline uses pipes with a diameter of φ273.1×6.4, a design pressure of 6.3 MPa, and is made of L290N steel. The project investment amount is 110 million yuan. 12. Changchun–Shijiazhuang Gas Pipeline Project (Phase II): This project is located in Zhangjiakou City, Baoding City, and Shijiazhuang City in Hebei Province, and is invested in and constructed by **Pipeline Group Northern Pipeline Co., Ltd.** The investment amount for the new 406.2 km Zhangjiakou–Shijiazhuang trunk line is unknown.
Reply #72026-03-03
13. Xixia County Danshui Receiving Station and Natural Gas Pipeline Project for the Third West-East Gas Transmission Line. This project is located in Xixia County, Nanyang City, Henan Province, and was invested in and constructed by Nanyang Longcheng Natural Gas Co., Ltd. The project includes a gas pipeline with a total length of approximately 16.6 km, the construction of a new Danshui reception station, and the construction of a new Quyuan Gang valve room. The Danshui receiving station is designed to handle a flow rate of 350 million Nm3 per year, with a design pressure of 4.0 MPa. It is equipped with facilities for filtration, metering, pigging, venting, and waste discharge. The Danshui receiving station is unattended; after filtration and metering, the natural gas is supplied to the Shiti pressure regulation station in Xixia County. The total investment for the project is currently unknown. 14. Heihe-Daqing Gas Pipeline Project in Heilongjiang Province: This project is located in Heilongjiang Province, starting from the Heihe terminal of the China-Russia East Line and ending at the Daqing distribution station of the same line; it was invested in and constructed by the Northeast Branch of **PetroChina Pipeline Network Co., Ltd. The project’s pipeline length is 545 kilometers, with a diameter of 1219 millimeters. The design pressure is 12 megapascals, and the designed capacity is 20 billion cubic meters per year. There are 3 stations and 21 valve rooms along the entire line. The total investment for the project is 960,000 million yuan.
Reply #82026-03-03
15. Off-site natural gas pipeline project for the Lanshan Power Center project in Ningbo’s petrochemical zone. This project is located in the Wantang New Area, the northern part of Wantang New Area, and the Niluoshan reclamation area within Ningbo’s petrochemical development zone in Zhejiang Province; it was invested in and constructed by Ningbo Zhongpu Petrochemical Investment Group Co., Ltd. The project starts at the provincial natural gas distribution terminal station (Zhenhai Power Center Station) and ends at Lanshan Power Center. The total length of the route is 6.8 kilometers (the total length of the pipelines is approximately 8.6 kilometers, of which the pipelines running in the same trench account for about 1.8 kilometers), and all of these elements are to be constructed anew. The project investment amount is 112.7 million yuan. 16. **Pipeline Group Zhejiang Natural Gas Pipeline Co., Ltd.’s Liuheng LNG Export Pipeline Project: This project is located on Liuheng Island in Putuo District, Zhoushan City, Zhejiang Province, as well as in Chunxiao Sub-district, Beilun District, Ningbo City. It was invested in and constructed by **Pipeline Group Zhejiang Natural Gas Pipeline Co., Ltd.** The main section of the project starts at Liuheng First Station in Liuheng Town, Zhoushan, and ends at Chunxiao North Station in Beilun District, Ningbo. The design pressure is 10 MPa, and the pipe diameter is 1016 mm. The main pipeline is constructed as two pipes running side by side, with a total length of approximately 33.92 kilometers ; The branches are two LNG receiving station inlet lines with lengths of 0.6 km and 1.63 km respectively. The project involves the construction of 1 station and 1 valve room, with a designed annual transportation capacity of 9.6 billion m3 per year. The project investment amount is 4,003.18 million yuan.
Reply #92026-03-03
17. S218 Anji-Longgang Highway – Yiwu Choujiang to Fotang section natural gas pipeline. This project is located on Xiangxi Road in Yiwu County, Jinhua City, Zhejiang Province, and was invested in and constructed by Yiwu Shuangjianghu Construction and Development Co., Ltd. The project starts at the interchange of Xiangxi Road S218 and Wuzhou Avenue, and ends at the Xufuo Line. The designed speed is 80 km/h, the roadbed width is 33.5 m, it has six lanes in each direction, and the entire route is paved with asphalt concrete. The project includes two underpass tunnels, with a total length of 3420 meters. The underpass under Shuangjianghu is 2,713 meters long. Parallel situation: The S218 Anji to Longgang Highway section from Choujiang to Futang in Yiwu (the section where Xiangxi Road passes underneath it) runs parallel to the Dongyang branch of the provincial natural gas pipeline. The length of the section where the distances between the two roads are less than 50 meters is approximately 340 meters (K3+460 to K3+800). In these parallel sections, the roads take the form of U-shaped channels or openly dug but covered passages; the minimum distance between the road and the natural gas pipeline is about 10.5 meters, and this is located near K3+460 (at the surface level of the road). Intersection scenarios: ① There is 1 intersection between the widened section of Fotang Avenue and the natural gas pipeline; ② There is 1 intersection each for the access roads on the east and west sides of Fotang Avenue with the natural gas pipeline. There are a total of 3 intersections. The total investment for the project is 1,856,064,000 yuan. 18. Guannan Newao Natural Gas Valve Station and Associated Pipeline Project: This project is located in Xiazhuang Village, Guannan County, Lianyungang City, Jiangsu Province, and was invested in and constructed by Guannan Newao Gas Co., Ltd. ①A new Guannan natural gas valve station has been built in Xiazhuang Village, Xinji Town, Guannan County, covering an area of approximately 6.12 mu. ②The high-pressure natural gas pipeline in front of Guannanmen Station starts at the Guannan distribution station and ends at Guannanmen Station. The pipe diameter is DN500, the design pressure is 4.0 MPa, and the length is approximately 0.4 km. The project investment amount is unknown.
Reply #102026-03-03
19. Xiangshui County Town-to-Town Medium-Pressure Natural Gas Pipeline Project. This project is located in Taizhou, Jiangsu Province, and was invested in and constructed by Taizhou China Resources Gas Co., Ltd. Xiangshui County Town-to-Town Medium-Pressure Natural Gas Pipeline Project. The total investment for the project is currently unknown. 20. Qingyuan Branch Natural Gas Pipeline Project: This project spans from the distribution station in Longquan County, Lishui City, Zhejiang Province to the Qingyuan terminal station, and it was invested in and constructed by Zhejiang Zheneng Natural Gas Pipeline Network Co., Ltd. It starts at the Longquan distribution station of the existing Yunhe-Longquan natural gas pipeline and ends at the Qingyuan terminal station of this project. With a total length of approximately 80 km, a design pressure of 6.3 MPa, and a designed annual transport capacity of 190 million cubic meters per year, the pipeline has a diameter of 406.4 mm. It passes through Longquan and Qingyuan counties in Lishui City, and along its course there are 2 stations and 2 valve rooms. The total investment for the project is 674.26 million yuan.
Reply #112026-03-03
【Haichuan Spring Festival Tea House: Spending Money】The sound of hooves heralds the arrival of spring, while the round shape of the Lantern Festival symbolizes togetherness. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5714484 (Source: Haichuan Chemical Industry Forum (Hua Hai Chuan Liu hcbbs))

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.