Thread Content
This project is located in the Xiheshan Industrial Park, which is part of the eastern industrial cluster area in the Jundong Economic and Technological Development Zone in Xinjiang. The central coordinates of the project are 90°15′7.125″ east longitude and 44°33′46.546″ north latitude. The project is a new one that uses medium-temperature coal tar, tar residue, anthracene oil, and other materials as raw materials. It employs a constant-pressure distillation process with three connected towers; through processes such as pretreatment, distillation, blending, and drying, it produces 800,000 tons of distillate oil, 300,000 tons of carbon black oil, and 164,000 tons of coal powder per year. 200,000 tons of coal tar residue and 1 million tons of medium-temperature coal tar are processed annually. The total investment in the project is 700 million yuan, of which 8.235 million yuan is allocated to environmental protection measures, accounting for 1.2% of the total project investment. Main project: Construction of 4 distillation units (3 in use and 1 as backup), with a total processing capacity of 1.2 million tons per year. It mainly includes a loading/unloading area, tank areas, pre-treatment units, distillation towers, and drying units. Supporting facilities: construction of 4 21MW gas-fired heat transfer oil boilers (2 in use and 2 as backups), 2 10t/h gas-fired steam boilers (1 in use and 1 as backup), 4 5MW tubular heating furnaces (3 in use and 1 as backup), 1 cooling system with a capacity of 3000 m3/h for clean circulating water, 5 sets of coal dust cooling systems with a capacity of 500 m3/h for dirty circulating water, 1 soft water production system with a capacity of 10t/h, 3 air compressors with a capacity of 24.2 m3/min (2 in use and 1 as backup), and 5 nitrogen generators with a capacity of 270 m3/h. Environmental protection facilities: 10 low-nitrogen burners, 1 set of exhaust gas treatment equipment, 13 exhaust stacks (9 in use and 4 as backups), 2 sets of secondary activated carbon adsorption units, 1 hazardous waste storage facility with a capacity of 150 m2, and 1 sewage treatment plant with a processing capacity of 500 m3/day, etc. (Source: Environmental Protection Bureau of Jundong Economic and Technological Development Zone, Xinjiang)
【HaiChuan Safety Discussion】Hidden Dangers Around Us – Eyewash Stations with a Water Outlet Height of Less than 15 cm https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5715076 (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
【3D Process Flow】Summary Post--Reverse Micelle Extraction Process Flow https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5715058 (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
【Ten Years of Rapid Development in Chemical Equipment】The first fully electrically driven pyrolysis gas compressor in China was successfully tested in the Tarim Phase II ethylene project at Dushanzi Petrochemical https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5714974 (Source: Haichuan Chemical Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Equipment】3034–2026: The world’s first fixed-bed copper-based catalyst process; East China University of Science and Technology, in collaboration with chlor-alkali manufacturers, overcomes the challenge of recycling hydrogen chloride as a by-product. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5715177 (Source: Haichuan Chemical Industry Forum (HCBBS))
【Haichuan Equipment Guessing Game】Wasps’ nests growing on pipes? ? ? https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5715340 (Source: Haichuan Chemical Industry Forum (Hua Hai Chuan Liu hcbbs))
【Common Issues in Haichuan Pipeline Design】--Calculation of Fluid Conveyance Pipelines https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5715465 (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2037 to 2026: China’s first independently designed and built large-scale integrated fracturing engineering vessel, the “Ocean Oil 696”, was delivered in Zhoushan, Zhejiang. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5715229 (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Equipment】3038=2026: Shandong Energy’s independently developed aldehyde-based fragrance project fills a technical gap in China, reducing reliance on imports! https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5715785 (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
【Ten Years of Rapid Development in Chemical Equipment】China’s first 20,000-ton wet-process masterbatch production line was put into operation at Hei Mao in Jiangxi from 2039 to 2026. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5715864 (Source: Haichuan Chemical Forum (Hua Hai Chuan Liu hcbbs))
【HaiChuan Safety Discussion】Compilation of Hidden Dangers Around Us – with pictures and texts; everyone is welcome to join the discussion: https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5705518 (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))