HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Feasibility study for Xinjiang Zhuneng Group’s 100,000-ton coal-based activated carbon exhaust gas reforming project is underway

2026-03-11View Original

Thread Content

Recently, Saiding’s Xinjiang branch attended a meeting held by Xinjiang Jueneng Group regarding the feasibility study report and the assessment report for the 100,000-ton coal-based activated carbon exhaust gas reforming project; the two parties had in-depth discussions on how to advance this project. At the meeting, Shu Xiaoliang, deputy general manager of Xinjiang Zhuneng Group, first provided an overview of the project as a whole, clarifying the project’s technological approach, core objectives, and key milestones. He pointed out that this project is an important measure taken by the group to advance its green transformation and improve the efficiency of comprehensive resource utilization. He urged all relevant units to attach great importance to it and strictly monitor the key milestones. He hoped that the project teams from both sides would work together more closely in future efforts to ensure that the feasibility study report and the reports prepared by the relevant authorities are scientific, rigorous, and practical. The successful holding of this kick-off meeting marks the entry of Xinjiang Zhuneng Group’s 100,000-ton coal-based activated carbon exhaust gas reforming project into a critical implementation phase, laying a solid foundation for the subsequent construction of the project and its transition toward a green and low-carbon development model.
Reply #22026-03-11
【Ten Years of Rapid Development in Chemical Equipment】The first fully electrically driven pyrolysis gas compressor in China was successfully tested at the Tarim Phase II ethylene project of Dushanzi Petrochemical Company. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5714974 (Source: Haichuan Chemical Forum (HCBBS))
Reply #32026-03-12
【Ten Years of Rapid Development in Chemical Engineering Equipment】The first domestic demonstration production line for the fiberization of coal-based solid waste with a capacity of 10,000 tons was put into trial operation between 2033 and 2026. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5715051 (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #42026-03-14
【Ten Years of Rapid Development in Chemical Equipment】3034–2026: The world’s first fixed-bed copper-based catalyst process; East China University of Science and Technology, in collaboration with chlor-alkali manufacturers, overcomes the challenge of recycling hydrogen chloride as a by-product. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5715177 (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #52026-03-14
【Ten Years of Rapid Development in Chemical Equipment】3034–2026: The world’s first fixed-bed copper-based catalyst process; East China University of Science and Technology, in collaboration with chlor-alkali manufacturers, overcomes the challenge of recycling hydrogen chloride as a by-product. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5715177 (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #62026-03-16
【Haichuan Equipment Guessing Game】Wasps’ nests growing on pipes? ? ? https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5715340 (Source: Haichuan Chemical Industry Forum (Hua Hai Chuan Liu hcbbs))
Reply #72026-03-16
[Common Issues in Haichuan Pipeline Design] – A compilation post; images and text are being updated. Feel free to join the discussion: https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5705828 (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
Reply #82026-03-17
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2037 to 2026: China’s first independently designed and built large-scale integrated fracturing engineering vessel, the “Ocean Oil 696”, was delivered in Zhoushan, Zhejiang. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5715229 (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #92026-03-17
【HaiChuan Safety Discussion】Compilation of Hidden Dangers Around Us – with pictures and texts; everyone is welcome to participate in the discussion: https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5705518 (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
Reply #102026-03-21
【Ten Years of Rapid Development in Chemical Equipment】China’s Giant Fiber Production Line for Electronic Use, the Largest in the World, Goes Online 3041-2026 https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5715973 (Source: Haichuan Chemical Forum (HCBBS))
Reply #112026-03-22
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2034 to 2026: Beijing Aerospace Power Research Institute’s first large-scale TO+RTO combustion unit designed independently began operating at full capacity successfully. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5716014 (Source: Haichuan Chemical Industry Forum (HCBBS))

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.