Thread Content
On March 10, the Jiuquan Municipal Ecology and Environment Bureau issued a public notice regarding the environmental impact assessment approval for the integrated project that combines wind and solar power for hydrogen production with biomass utilization to manufacture 150,000 tons per year of green methanol – specifically, the photovoltaic, energy storage, and hydrogen production components of this project. Investment amount: Total investment of 350 million yuan ; Construction nature: New construction ; Construction location: Bulongji Township, Guazhou County, Jiuquan City, Gansu Province ; Construction of this project is expected to begin in March 2026, with completion and commissioning scheduled for September 2027 ; This project is a photovoltaic power generation project that serves as a supporting facility for Gansu Runlong Hongneng Energy Management Co., Ltd.’s integrated project for hydrogen production coupled with the use of biomass to manufacture 150,000 tons per year of green methanol. The generated green electricity is connected to the newly built 110kV substation in the park, to be used for subsequent projects such as hydrogen production and methanol production. It is in line with the regional guidelines for the development of new energy sources, and it also responds to the call for expanding the use of hydrogen, thereby contributing to the sustainable development of new energy.
【Ten Years of Rapid Development in Chemical Engineering Equipment】3037-2026: China’s first independently designed and built large-scale integrated fracturing engineering vessel, the “Ocean Oil 696”, was delivered in Zhoushan, Zhejiang. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5715229 (Source: Haichuan Chemical Industry Forum (HCBBS))
【3D Process Flow】Summary Post--Two-Phase Extraction https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5715799 (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
【HaiChuan Safety Discussion】Compilation of Hidden Dangers Around Us – Illustrated with photos and texts; everyone is welcome to join the discussion: https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5705518 (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
【HaiChuan Safety Discussion】Hidden Dangers Around Us – Distribution room doors designed to open inward https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5715825 (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
【Ten Years of Rapid Development in Chemical Equipment】3038=2026: Shandong Energy’s independently developed aldehyde-based fragrance project fills a technical gap in China, reducing reliance on imports! https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5715785 (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
A true classic! ! ! The elbows subjected to prolonged liquid flow are truly astonishing! ! ! ! https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5714477 (Source: Haichuan Chemical Industry Forum (Hua Hai Chuan Liu hcbbs))
【Special Topic on Safety Facility Design】Discussion Summary Post: https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5714902 (Source: Haichuan Chemical Industry Forum (Hua Hai Chuan Liu hcbbs))
【Ten Years of Rapid Development in Chemical Equipment】From 2030 to 2026, China’s first fully domesticated, end-to-end industrial facility for producing 100,000 tons per year of POE (polyolefin elastomer) using the solution process has entered the stage of commissioning at Tianjin Petrochemical. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5716079 (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
【Ten Years of Rapid Development in Chemical Engineering Equipment】China’s first subcritical once-reheat power unit was successfully connected to the grid for power generation between 2030 and 2026. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5716102 (Source: Haichuan Chemical Engineering Forum (HCBBS))