Project to produce 150,000 tons of polyurethane products and 30,000 tons of N,N-dimethylformamide per year

2026-03-24View Original

Thread Content

Recently, the project of Weihecheng Chemical (Shandong) Co., Ltd. to produce 150,000 tons per year of polyurethane products and 30,000 tons per year of N,N-dimethylformamide (DMF) has been made public for review on relevant websites. Project Overview: Project Name: Project for Annual Production of 150,000 tons of Polyurethane Products and 30,000 tons of N,N-Dimethylformamide. Developer: Weihecheng Chemical (Shandong) Co., Ltd. Location: Changyi Xiaying Chemical Industrial Park, Weifang City, Shandong Province. Project Investment: 503,397,200 yuan. Construction Period: Construction is expected to begin in June 2026, with production starting in June 2027. Core Products and Production Capacities: The project features a diverse range of products, with the following main production capacities: Polyester polyols: 50,000 tons per year; Polyurethane resins: 50,000 tons per year; Polyurethane sole raw materials: 30,000 tons per year; Solvent-free polyurethane hot melt adhesives: 20,000 tons per year; N,N-Dimethylformamide (DMF): 30,000 tons per year. This new project in Shandong will generate significant demand for construction materials in the future, representing a potential opportunity for suppliers of valves, pipes, instruments, and other equipment that deserves long-term attention.
Reply #22026-03-24
【Ten Years of Rapid Development in Chemical Equipment】From 2030 to 2026, China’s first fully domesticated, end-to-end industrial plant for producing 100,000 tons per year of POE (polyolefin elastomer) using the solution process was put into commission at Tianjin Petrochemical. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5716079 (Source: Haichuan Chemical Forum (HCBBS))
Reply #32026-03-25
【Ten Years of Rapid Development in Chemical Engineering Equipment】China’s first subcritical once-reheat power unit was successfully connected to the grid for power generation between 2030 and 2026. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5716102 (Source: Haichuan Chemical Engineering Forum (HCBBS))
Reply #42026-03-27
【Ten Years of Rapid Development in Chemical Engineering Equipment】China’s first subcritical once-reheat power unit was successfully connected to the grid for power generation between 2030 and 2026. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5716102 (Source: Haichuan Chemical Engineering Forum (HCBBS))
Reply #52026-03-28
【Ten Years of Rapid Development in Chemical Engineering Equipment】Successful pilot testing of Dongfang Electric’s natural gas-ammonia combustion technology from 2032 to 2026! https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5716290 (Source: Haichuan Chemical Industry Forum (Hua Hai Chuan Liu hcbbs))
Reply #62026-03-29
【Common Issues in Haichuan Pipeline Design】--How to open and maintain valves that are crowded together? ? https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5716525 (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
Reply #72026-03-29
【Ten Years of Rapid Development in Chemical Engineering Equipment】3053–2026: China’s first 100-kilometer-long carbon dioxide transmission pipeline – the million-ton-class CCUS carbon dioxide pipeline in the Shengli Oilfield has been operating steadily for 1,000 days. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5716490 (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #82026-03-29
Which party is responsible for designing the equipment lifting lugs: the design firm, the manufacturing firm, or the construction firm? https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5716586 (Source: Haichuan Chemical Industry Forum (Hua Hai Chuan Liu hcbbs))
Reply #92026-03-30
【Ten Years of Rapid Development in Chemical Equipment】3031-2026: The Largest in Asia! China’s independently designed cylindrical \"offshore oil and gas plant\" has begun construction in Qingdao https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5714904 (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #102026-03-30
【Ten Years of Rapid Development in Chemical Equipment】3034–2026: The world’s first fixed-bed copper-based catalyst process; East China University of Science and Technology, in collaboration with chlor-alkali manufacturers, overcomes the challenge of recycling hydrogen chloride as a by-product. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5715177 (Source: Haichuan Chemical Industry Forum (HCBBS))

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.