Thread Content
Recently, the 1 million tons per year coal-to-oil project of Yitai Yili Energy Co., Ltd. has entered a critical phase of accelerated progress, with the construction of the main project components and supporting facilities advancing simultaneously. As a key demonstration project for the clean and efficient utilization of coal, this project is located in the Yinan Industrial Park of Chabuchar Xibe Autonomous County in Xinjiang. With a total investment of 21.043 billion yuan, it builds on the 1 million tons per year coal-to-oil project approved by the **Development and Reform Commission, adding four additional projects for the production of alkylbenzenes, reformed isomers, alpha-olefins, and ethanol. The main project primarily includes production facilities such as air separation, coal gasification, purification, oil synthesis, hydrogen production from tail gases, and oil processing. Supporting facilities include thermal power stations, water treatment plants, circulating water systems and other auxiliary engineering projects; storage and transportation facilities such as coal silos and storage tanks; as well as environmental protection projects like wastewater treatment and reuse systems. The project is scheduled to begin trial operation in 2027 to produce qualified products. Upon completion and commissioning of the project, the designed annual output of the main product is 1.1508 million tons. It is reported that at present, the project construction is primarily focused on carrying out the related auxiliary works in order to enable the first boiler to be ignited by late June 2026. On April 27, the Yitai Ili coal-to-oil project reached an important milestone as the 110kV substation was successfully powered up for the first time. Currently, the main process unit is focusing on completing civil works and steel structure installations, thereby creating conditions for the subsequent installation of process pipelines. The installation of the pipeline network in the external pipe installation area across the entire plant in the assembly area is underway. The piping for the process systems in each unit area has also begun to be installed. In May, as the floor construction in various unit areas progresses, pipeline installation will be carried out on a full scale. The interior decoration of the substations and cabinet rooms within each unit area has been completed, and transformers, distribution cabinets, and control cabinets have been installed in place.
【3D Process Flow】Summary Post--How Is Steel Made? Detailed multi-image guide to the entire process from ore to steel: https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5720138 (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
【Haichuan Teahouse】A spoonful of hot porridge paired with fish rice – an iconic home-style flavor etched in the memories of the Teochew people. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5720139 (Source: Haichuan Chemicals Forum (Hua Haichuan Liu hcbbs))
【Haichuan Teahouse】The soul of Shantou home-cooked dishes: plain rice porridge paired with delicious meat and rice, https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5720146 (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
【History of Haichuan Chemicals】The alarm remains ringing | A roundup of the top 10 worst engineering accidents in global history④ Collapse of the roof of the Katowice Trade Hall https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5720210 (Source: Haichuan Chemicals Forum (Hua Haichuan Liu hcbbs))
【HaiChuan Safety Discussion】Hidden Dangers Around Us – Unsealed holes in firewalls between different fire compartments (such as those caused by electrical wiring and pipelines passing through) https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5720283 (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
【Ten Years of Rapid Development in Chemical Equipment】3109-2026: Proprietary technology! CCCC for the cracking furnace area of the ethylene plant in Tarim’s 1.2 million tons/year Phase II ethylene project https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5719713 (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
【3D Process Flow】Coal chemical processing technologies and key equipment https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5720380 (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
[Common Issues in Haichuan Pipeline Design] – A compilation post; images and text are being updated. Feel free to join the discussion: https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5705828 (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
【Ten Years of Rapid Development in Chemical Engineering Equipment】The first domestic 1,500-meter depth drilling riser system developed independently by China National Offshore Oil Corporation was put into use between 2019 and 2026. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5720299 (Source: Haichuan Chemical Industry Forum (HCBBS))