[Haichuan Modularization] The 1.6 million tons/year ethylene cracker for SinoShell Huizhou Phase III was shipped in its entirety from Maoming

2026-04-10View Original

Thread Content

On April 8, the whistles at Maoming Petrochemical Port blared as a \"giant\" – an ethylene cracker module measuring over 50 meters in length, over 20 meters in width, nearly 50 meters in height, and weighing more than 2,000 tons – was officially shipped off for delivery to the Daya Bay Petrochemical Zone in Huizhou. CNOOC Shell Huizhou Phase III Ethylene Project is a **major strategic integrated refining and chemical complex** with a total investment of 48 billion yuan. Once completed, its total ethylene production capacity will reach 3.8 million tons per year, making it the largest single ethylene production facility in China. As the \"heart\" of the project’s core equipment, the technical level and manufacturing quality of the 1.6 million tons per year ethylene cracker directly determine the operational efficiency and safety stability of the entire facility. The pyrolyzer modules shipped this time were manufactured by Maoming Gravity Petrochemical Equipment Co., Ltd. (hereinafter referred to as “Maoming Gravity”). This equipment features a modular design for manufacturing, transportation, and installation as a complete unit, including all internal components such as primary quench heat exchangers, thereby enabling an \"plug-and-play\" delivery of ultra-large ethylene cracking furnaces. The body of the pyrolysis furnace is over 50 meters long, more than 20 meters wide, and nearly 50 meters high; its total weight exceeds 2,000 tons, which is equivalent to that of a 15-story \"steel building\" and roughly equal to the weight of over a thousand cars.
Reply #22026-04-11
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2033 to 2026, China’s first pilot project for hydrogen combustion in 660-megawatt coal-fired boilers achieved breakthroughs in both coal-hydrogen mixed combustion and pure hydrogen combustion. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717514 (Source: Hainan Chemical Industry Forum (HCBBS))
Reply #32026-04-11
【3D Process Flow】【3D Process Flow】Summary Post -- Petroleum Refining Process Flow Diagram 16 -- Molecular Sieve Adsorption Purification Process Diagram https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717601 (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
Reply #42026-04-13
【Ten Years of Rapid Development in Chemical Processing Equipment】3080–2026: China’s first comprehensive evaluation standard for smart factories – the \"General Rules for Evaluating Smart Factories\" (GB/T 46734—2025). **The standard has been officially implemented.** https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717616 (Source: Haimen Chemical Industry Forum (HCBBS))
Reply #52026-04-14
【Ten Years of Rapid Development in Chemical Engineering Equipment】The on-site facility for China’s first pilot project related to carbon capture, utilization, and storage as well as enhanced natural gas recovery (CCUS-EGR) in high-sulfur gas fields was successfully put into operation between 2030 and 2026. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717658 (Source: HaiChuan Chemical Engineering Forum (HCBBS))
Reply #62026-04-15
【3D Process Flow】Summary Post--Xinjiang Zhundong’s 33.8-billion-yuan green hydrogen industry chain: the entire process from hydrogen production via wind and solar power to its use in chemical industries https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717774 (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
Reply #72026-04-15
【HaiChuan Safety Discussion】Hidden Dangers Around Us – Choosing the Sampling Point for Pressure Gauges Below Horizontal Pipes https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717839 (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
Reply #82026-04-15
【Ten Years of Rapid Development in Chemical Processing Equipment】3083-2026: SHENGU manufactures China’s first single-stage cantilevered fully assembled centrifugal compressor https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717804 (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #92026-04-16
【Ten Years of Rapid Development in Chemical Processing Equipment】The world’s first pilot plant for hydrogen metallurgy using green electricity and green hydrogen was put into operation at Ansteel’s Bayuquan production facility from 3084 to 2026. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717808 (Source: Haichuan Chemical Industry Forum (HCBBS))

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.