HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Public notice on the licensing of key technologies for the 56 billion yuan coal-to-oil project in Hami, Xinjiang

2026-04-14View Original

Thread Content

Public notice regarding the licensing of key technologies for the 56 billion yuan coal-to-oil project in Hami, Xinjiang: On the 10th, a public notice was issued regarding the sole-source procurement for the technology licensing, process package development, training, and technical services related to the coal liquefaction facility under the Hami Energy Integration and Innovation Base Project (Phase I: Coal-to-Oil Project) by ** Energy Group. Project name: **Energy Group Hami Energy Integration and Innovation Base Project (Phase I: Coal-to-Oil Project)**
Construction location: Chahaqquan Area, Barkol Santanghu Industrial Park, Hami City, Xinjiang Uygur Autonomous Region
Constructor: **Energy Group Xinjiang Hami Energy and Chemical Co., Ltd.**
The total investment in this project amounts to 55.97 billion yuan, of which 7.8 billion yuan is allocated for environmental protection efforts, accounting for 13.94% of the overall project investment. The main construction components include 19 process units such as 3.2 million tons per year of direct coal liquefaction and 0.8 million tons per year of indirect coal liquefaction, along with the supporting auxiliary facilities. Project overview: The project includes main works, storage and transportation works, utility works, auxiliary works, environmental protection works, etc. The main processes include 19 sets of process units in total, such as coal powder preparation, catalyst preparation, coal liquefaction, hydrogenation stabilization, hydrogenation reforming, light hydrocarbon recovery, asphalt formation, coal gasification, shift reaction, low-temperature methanol washing, oil synthesis, oil processing, PSA, hydrogen purification, air separation, desulfurization, sulfur recovery, phenol-ammonia recovery, and green hydrogen production ; Storage and transportation engineering includes coal silos, liquid storage tanks, and truck loading/unloading stations ; Auxiliary engineering includes water supply and drainage systems, power supply systems, waste heat utilization units, wastewater temporary storage tanks, rainwater monitoring tanks and accident tanks, as well as flare gas recovery and emission systems ; Environmental protection projects include facilities for incinerating solid and liquid waste, oil and gas recovery and treatment facilities, sewage treatment plants, hazardous waste storage warehouses, rigid landfills, etc. The project relies on the Chahaquan No. 1 Open-pit Coal Mine and its coal preparation plant, coal conveyance gallery, park water supply project, power supply project, general industrial solid waste landfill within the park, the district’s combined heat and power project utilizing thermal islands, new energy projects, etc. It is understood that the overall planning for the project’s construction includes: Phase 1 – the coal-to-oil project; Phase 2 – supporting chemical engineering projects and coal-to-oil storage facilities, as well as associated coal mines (including coal transportation infrastructure); external railways, water supply, power supply, new energy systems, slag disposal areas, carbon capture, utilization and storage (CCUS) facilities, and a production control center. Phase II – The coal chemical engineering project serves as a supporting project for the Phase I coal-to-liquids project with an annual capacity of 4 million tons. Utilizing naphtha and LPG produced in Phase I as raw materials, this phase involves the construction of a coupled naphtha-methanol cracking unit and a natural gas co-production unit. Additionally, facilities such as coal gasification units, methanol synthesis units, olefin separation units, utilities, and auxiliary facilities will also be built. The project combines coal chemical processing with coal-to-oil conversion to carry out high-value deep processing, extending the product value chain; through technological innovation and integration, it promotes the clean, low-carbon, and efficient utilization of high-carbon resources.
Reply #22026-04-15
【Ten Years of Rapid Development in Chemical Equipment】3082-2026 to Fill the Gaps. The first phase of the 50,000-ton/year ultra-high molecular weight polyethylene project by CNCEC Western New Materials was successfully commissioned on the first attempt. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717659 (Source: Haichuan Chemical Forum (Huahai Chuanliu hcbbs))
Reply #32026-04-15
【3D Process Flow】Summary Post – Xinjiang Zhundong’s 33.8-billion-yuan green hydrogen industry chain: the entire process from hydrogen production via wind and solar power to its use in chemical industries https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717774 (Source: Huchuan Chemicals Forum (Hua Hai Chuan Liu hcbbs))
Reply #42026-04-15
【HaiChuan Safety Discussion】Hidden Dangers Around Us – Choosing the Sampling Point for Pressure Gauges Below Horizontal Pipes https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717839 (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
Reply #52026-04-17
【Ten Years of Rapid Development in Chemical Processing Equipment】China National Petroleum’s first megawatt-class PEM hydrogen production system passed the authoritative CNAS testing and certification https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717958 (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #62026-04-17
【HaiChuan Safety Discussion】Hidden Dangers Around Us – The Use of Submersible Long-Shaft Pumps for Oil-Contaminated Sewage Pumps in Tank Areas https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717995 (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
Reply #72026-04-18
【Haichuan Equipment Guess Game】 What’s that thing tied to the pipe? ? https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5718037 (Source: Haichuan Chemical Engineering Forum (Huahai Chuanliu hcbbs))
Reply #82026-04-19
[Grand Discussion on Haichuan’s Modular Installation] Summary thread; everyone is welcome to join the discussion! https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=1773168 (Source: Haichuan Chemical Industry Forum (Hua Hai Chuan Liu hcbbs))
Reply #92026-04-20
【Ten Years of Rapid Development in Chemical Processing Equipment】3087-2026: China’s first offshore mobile multi-functional platform, “Zengchan No.1”, was delivered https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5718136 (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
Reply #102026-04-21
【Ten Years of Great Development in Chemical Equipment】3088-2026: China’s first demonstration project on producing high-quality synthetic crude oil from green hydrogen and low-grade heavy oil has been launched. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5718140 (Source: Haichuan Chemical Forum (HCBBS))

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.