The first compression unit of the sixth compressor set in the air separation unit of the China Coal Yulin Coal Deep Processing Base project completed its initial trial run successfully

2026-04-28View Original

Thread Content

Recently, the first compression unit of the sixth compressor set in the air separation unit of the China Coal Yulin Coal Deep Processing Base project, constructed by the Inner Mongolia branch of China National Chemical Engineering Third Construction Co., Ltd., completed its initial trial run successfully. This marks a significant milestone in the construction of this project, laying a solid foundation for subsequent joint trials of the entire facility and its commissioning on schedule. The air separation unit associated with this project has a production capacity of 3×85,000 Nm³/h, resulting in an overall oxygen production capacity of 255,000 Nm³/h; it is currently the largest cluster of electrically driven air separation units under construction in China. The Inner Mongolia branch undertook the construction of the fifth and sixth air separation units, as well as the related building installation works. Faced with challenges such as the high precision requirements for lifting large equipment and the complexity of multi-disciplinary coordination, the project team adhered to scientific planning and meticulous management, successfully installing the 135-ton air compressor unit. They also provided systematic safety and technical training to all construction workers to ensure that the operations were carried out safely and under control. During the commissioning phase, the project team, in collaboration with all participating units, established a dedicated commissioning team to carry out thorough testing of key auxiliary systems such as the high-voltage electrical system of the main motor, the circulating water system, the lubricating oil system, and the CCS control system. By continuously optimizing operational parameters and overcoming various technical challenges, it was possible to ensure the efficient progress of the critical construction tasks, ultimately resulting in the successful first trial run of the compressor. As the first large-scale coal chemical project approved by the Ministry of Ecology and Environment since the introduction of the **\"3060\" dual-carbon goals, the China Coal Yulin Project is of great significance for promoting the clean and efficient use of coal and ensuring **energy security. The main construction components of the project include an annual production capacity of 2.2 million tons of methanol, 900,000 tons of polyolefins, and 250,000 tons per year for LDPE/EVA chain extension and elongation processes. Once it is completed and put into operation, it will significantly facilitate the clean conversion of coal resources into high-end chemical products, drive the upgrading of regional industries and economic development, and inject new momentum into the advanced, diversified, and low-carbon development of China’s coal chemical industry. The successful trial operation of this first compressor set represents another significant achievement for the Inner Mongolia branch in project construction. Next, the project team will continue to uphold a spirit of hard work and pursuit of excellence, focus on key milestones, and steadily advance the subsequent debugging and completion tasks. By maintaining strict controls over quality, safety, and progress, they will ensure that the facility meets all standards in a comprehensive and stable manner, striving to bring the project online as soon as possible and contributing positively to the high-quality development of China’s coal chemical industry.
Reply #22026-04-28
【Hechuan Modular Installation Discussion】Summary post – everyone is welcome to join the discussion! https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=1773168 (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
Reply #32026-04-28
【HaiChuan Safety Discussion】Hidden Dangers Around Us – Missing Handles and Wheels on Pipe Valves https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5718812 (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
Reply #42026-04-28
【HaiChuan Safety Discussion】Hidden Dangers Around Us – Missing Handles and Wheels on Pipe Valves https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5718812 (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
Reply #52026-04-28
【Essential】In metal materials, the α phase, β phase, γ phase, and so on can always be seen. Do you know why they are named this way? https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5718856 (Source: Haichuan Chemical Industry Forum (Hua Hai Chuan Liu hcbbs))
Reply #62026-04-29
【Ten Years of Rapid Development in Chemical Equipment】3082-2026 to Fill the Gaps. The first-phase project of Zhonghua Chemical Western New Materials, with a capacity of 50,000 tons per year for the production of ultra-high molecular weight polyethylene, successfully completed its trial operation with the first batch of materials fed into the system. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717659 (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
Reply #72026-04-29
【HaiChuan Safety Discussion】The world’s first 5MW AEM hydrogen production system, model 3101-2026, has been installed, commissioned, and tested https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5718929 (Source: HaiChuan Chemicals Forum (HuaHaiChuanLiu hcbbs))
Reply #82026-04-29
【Ten Years of Rapid Development in Chemical Equipment】Breakthroughs from 3095 to 2026! China’s hydrogen pipeline project secures first order in Europe https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5718447 (Source: HCBBS Chemical Forum)
Reply #92026-04-30
【Ten Years of Rapid Development in Chemical Equipment】China’s First Set: 3097-2026 Construction begins on the nuclear power high-temperature medium-pressure steam supply test and verification platform project https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5718496 (Source: HaiChuan Chemical Industry Forum (HuaHaiChuanLiu hcbbs))
Reply #102026-04-30
【Ten Years of Rapid Development in Chemical Equipment】China’s First Set: 3097-2026 Construction begins on the nuclear power high-temperature medium-pressure steam supply test and verification platform project https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5718496 (Source: HaiChuan Chemical Industry Forum (HuaHaiChuanLiu hcbbs))

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.