Thread Content
Recently, more good news came in from the construction site of Ningxia Baofeng Energy Group Co., Ltd.’s second 500,000 tons per year coal-to-olefins project, which is being built by Shaanxi Huajian Xi’an Company – the lower section of reactor 104 in the MTO unit was successfully installed in one go, marking a full entry into the final phase of installation for the project’s core equipment. It is reported that the MTO unit serves as the \"heart\" of the coal-to-olefins process chain, with the Reactor 104 being the most critical component of the entire unit. The lower section of the cylinder being lifted this time is equipped with a working platform and other safety devices. In terms of its structure, it is larger at the bottom and smaller at the top; it is 17 meters high, with a diameter of 15.8 meters at the upper end and 8.9 meters at the lower end. Its total weight is 340 tons. The precision required for lifting it is extremely high, and the construction process becomes significantly more difficult due to factors such as the presence of numerous surrounding structures and the complex conditions associated with night-time operations. Before the lifting operation, the project team organized all management and operational staff to conduct a thorough technical and safety briefing. A joint inspection was carried out to verify the mechanical properties of the 1600-ton crawler crane, as well as its lifting equipment, safety devices, and emergency response measures, ensuring that responsibilities were assigned to specific individuals and that all necessary measures were in place. On that day, after being lifted by the main crane, rotated under heavy load, and lowered smoothly, the lower base of the reactor accurately fit into the foundation foot bolts after 2 hours; the gaps around it were uniform, and the reactor was successfully installed in one lifting operation.
【In-depth Discussion on Haichuan’s Modular Installation】Successful shipment of Module No. 1 for the dock tunnel in Indonesia’s CAA-1 caustic soda project https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5721596 (Source: Haichuan Chemicals Forum (Hua Haichuan Liu hcbbs))
【Haichuan Building Design Review】Is it necessary to apply fire-resistant coating to the steel structure part of the glass panel canopy installed above the exits that lead directly from the building to the outside? https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5721619 (Source: Haichuan Chemical Industry Forum (Hua Hai Chuan Liu hcbbs))
【HaiChuan Chemical Valve Management】Series Posts–40,000 People Flee in California: A Faulty Valve Triggers a High-Risk Chemical Emergency Race Against Time https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5721634 (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
【Haichuan Illustrated Chemical Equipment】 Series Posts -- Trickle Bed Reactor https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5721650 (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
【Haichuan Teahouse】Wild Vegetable Series--Where is this from? Have you ever eaten wild vegetables with a unique mustard-like aroma? ? https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5721720 (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
【Haichuan Teahouse】The Authentic Flavor of Shantou – Miancheng Turtle Cake https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5721721 (Source: Haichuan Chemicals Forum (Hua Haichuan Liu hcbbs))
【Ten Years of Rapid Development in Chemical Processing Equipment】Successful trial operation of China’s first full-density polyethylene extrusion granulation unit, 3136-2026 https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5721697 (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
【HaiChuan Safety Discussion】Hidden Dangers Around Us – Incorrect Setting of Alarm Values for Flammable Gas Detectors https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5721784 (Source: HaiChuan Chemicals Forum (HuaHaiChuanLiu hcbbs))
【In-depth Discussion on Modular Installation for HaiChuan】--Modular lifting of the steel structure for large-scale dewatering tanks; all large-scale lifting operations for the closed coking removal project at Liaohe Petrochemical have been successfully completed! https://bbs.hcbbs.com/thread-5721906-1-1.html (Source: Haichuan Chemical Industry Forum (Hua Hai Chuan Liu hcbbs))