Thread Content
In 2026, during the 25th National “Safety Production Month”, everyone is encouraged to prioritize safety and be capable of responding to emergencies; efforts should also be made to identify and rectify potential risks and hazards. -------------------------------------------------- On July 1, the Huai’an Ecological Environment Bureau issued its approval regarding the Environmental Impact Report for the construction project of Huai’an Hechuang New Material Technology Co., Ltd.’s facility aimed at producing 348,000 tons of polyurethane products per year (Phase I). According to the environmental impact assessment document, Huai’an Hechuang New Materials Technology Co., Ltd. (abbreviated as “Huai’an Hechuang”; it was established with investment from Huai’an Xingsheng Construction Investment Co., Ltd., which is a state-owned platform enterprise wholly owned by Huai’an Investment Holding Group Co., Ltd.) is located in the chemical industry zone of Huai’an Industrial Park, Jiangsu Province. The site covers an area of approximately 267 mu, and a total investment of 3.05 billion yuan has been allocated for the construction of a project capable of producing 348,000 tons of polyurethane products annually. The project planning involves construction in two phases: In the first phase, the production capacity will be 97,500 tons per year of aliphatic polyols, 97,500 tons per year of aromatic polyols, 15,000 tons per year of MDI-type adhesives, and 15,000 tons per year of TDI-type adhesives ; In the second phase, the production capacity will reach 16,000 tons per year for thermoplastic polyurethane elastomers (TPU), 16,000 tons per year for cast polyurethane elastomers (CPU), 8,000 tons per year for adipate-based plasticizers, 8,000 tons per year for benzate-based plasticizers, 40,000 tons per year for water-based polyurethane paints, and 35,000 tons per year for glycerin. In accordance with the phased construction plan, the scope of this environmental impact assessment is defined as all construction activities under the first phase of the project. Evaluation work will be carried out separately in the second phase. The total investment for this project is 3.05 billion yuan, of which 1.55 billion yuan is allocated to the first phase, with 13.5 million yuan invested in environmental protection measures.
【Ten Years of Great Development in Chemical Equipment】3183-2026: The first large-scale phenol extraction project from coal tar in China – the 100,000-ton/year green phenol extraction project from coal tar undertaken by Xinjiang Xuanli has been successfully handed over. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5725540 (Source: Haichuan Chemical Forum (HCBBS))
[Common issues in Haichuan pipeline design] -- For the hydrogenation unit, the stem of the gate valve on the connecting line between the outlet and inlet pipelines should be installed facing downward. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5725261 (Source: Haichuan Chemical Forum (HCBBS))