Flue gas pipeline

2015-06-07View Original

Thread Content

Is it necessary to install expansion joints in the horizontal pipe section from the flue gas collector duct to the triple swirl?
Reply #22015-06-07
Anyway, we didn’t add it here. . . .
Reply #32015-06-08
Calculate the expansion amount and then decide. If the horizontal section is short, it needs to be added.
Reply #42015-06-08
Haven’t we added it here either? I’m not sure what the original poster is trying to ask But additions were made on both sides of the three-spin outlet leading to the smoke extractor, as well as on the double-acting slide valve ;
Reply #52015-06-08
You can’t just add this thing whenever you want; it needs to be calculated. Don’t look at how others are; focus on whether it’s truly needed.
Reply #62015-06-08
Our device doesn’t have it installed; it’s about 20 meters long roughly
Reply #72015-06-09
It still needs to be calculated before addition; it is mainly used to accommodate the expansion during start-up and shutdown phases. If the impact is minimal, it may be possible to omit it.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.