Thread Content
The asphalt loading pipeline is designed as two DN350 pipelines, with a length of 3,000 meters from the pump outlet to the dock. Skin-effect electric heating is planned to be used. Could everyone please offer some suggestions regarding the feasibility of this approach? Are there any established experiences in this area? It would also be possible to conduct on-site inspections.
Skin-effect heating has advantages over traditional heating methods, but it seems to be used in the vast majority of cases on crude oil pipelines at present. I have a few questions regarding the heat tracing for asphalt pipelines. 1. What temperature is required for loading asphalt onto a ship? If it’s not continuous loading, does the heat tracing still need to serve the purpose of heating the pipes at certain times? Can the maximum heating level of that surface heating system meet the temperature requirements of the asphalt? 2. Will the cable suffer from aging at relatively high temperatures? 3. It seems that skin-effect heating cannot be used to heat valves, pumps, etc.; are there any additional devices that need to be heated during loading? If so, does one need to consider other heating methods as well? A related article was also found, titled \"Discussion on the Heating Methods for Asphalt Transportation Pipelines in Petrochemical Enterprises.\" The abstract of the article states that steam heating is a widely used heating method in petrochemical enterprises. Due to the complex operating conditions of process pipelines, there are various options available for pipeline heat tracing. Through a comparison of the two heating methods used in petrochemical enterprises for asphalt transport pipelines – steam jacketing and external heating pipes + thermal paste – it was found that the method of external heating pipes + thermal paste requires less investment, offers higher heat utilization efficiency, and is simpler to implement; therefore it can be widely applied to asphalt transport pipelines.
Crude oil generally has a low freezing point; high-quality crude oil can even do without heating. Electric heat tracing has been used on crude oil pipelines. Asphalt has a high freezing point, and it is also necessary to maintain it at an appropriate temperature in order to reduce its viscosity and facilitate transportation. For the condition of intermittent loading and transportation, with a pipeline length of 3 km, it is difficult to empty the pipeline; continuous temperature maintenance is required, resulting in high energy consumption. Electric heat tracing generally requires a large initial investment. Given its length, it is necessary to consider whether high-voltage or low-voltage power supply should be used, as well as whether a separate substation near the starting point is needed – all of these factors must be taken into account.
First of all, I’d like to thank the two people above for their suggestions; thank you. The main issue with using steam heating is the return water problem; since the length of the quay surface reaches 2000 meters, it is difficult to manage steam recovery, which is why electric heating is used instead. Electric heating can be controlled at any time, but the question is whether the temperature can be maintained.
Using heat transfer oil for heating is still the more reliable option
Using electric heating is sufficient. It enables interlocked power on/off for heating at high and low temperatures.