Select the appropriate absorber based on the following conditions

2015-06-12View Original

Thread Content

15,000 cubic meters of waste gas per hour, at 150 degrees Celsius and 20% HCl concentration – what size should the absorber and cooler be, and how many stages are required? The pressure of the waste gas is not high; should a fan be used or something else? ?
Reply #22015-06-12
These are related to the manufacturing process; I don’t understand them. @haiyangqh @ylb913 @maning1984 @XiaoA_Doubi
Reply #32015-06-12
This post was last edited by chenbinhuai2013 on 2015-6-12 at 13:17; absorption is carried out using an absorption tower, and the absorbent solution is then cooled. Power is provided by vacuum extraction. You can contact me within the site if needed

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.