HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Please ask

2015-07-01View Original

Thread Content

Why is a drain valve needed above the check valve when the pump outlet pipe is vertical upward? ? ? ?
Reply #22015-07-02
It is designed to ensure that the internal medium can be completely drained during the maintenance of the pump. With a high-quality check valve, some medium will remain between the check valve and the outlet valve.
Reply #32015-07-02
It is mainly used for condensate drainage and venting.
Reply #42015-07-03
After the pump is removed, the fluid above the check valve cannot flow back into the pump; this drain valve allows the fluid in this section of the pipeline to be emptied

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.