HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Regarding the commissioning of storage tanks/buffer tanks

2015-07-04View Original

Thread Content

Hello everyone. I would like to ask that when we conduct regular inspections of storage tanks/cushion tanks, if there is a mechanical level gauge in the tank that is about 30 feet (around 9 meters) long, and we want to remove it for replacement due to damage, can we simply use a crane to pull the entire gauge out? Considering that gauge isn’t very heavy. Are there any easier and cheaper ways to do it during construction?
Reply #22015-07-07
It can be pulled out directly; the steel strip is soft
Reply #32015-07-07
But is it soft? It’s a steel pipe

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.