HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Preparations before powering on the control cabinet

2015-07-09View Original

Thread Content

What checks and preparations are required before powering on the control cabinet?
Reply #22015-07-09
If you are the end user, you should have the DCS manufacturer present to conduct a thorough inspection before powering on the DCS control cabinet. Actually, the inspection covers just a few aspects: whether the power supply meets the manufacturer’s requirements, and whether the grounding meets the manufacturer’s requirements. If the signal wires of the instruments and equipment on site are already connected to the IO cards, each wire must be checked, and this should be done without power applied. Once all these tasks are completed, it can be powered on. To put it simply, a power-on check involves checking the power supply and grounding; as long as the manufacturer is involved, there’s no need to worry too much.
Reply #32016-11-27
So what preparations/checks do end-users need to make?

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.