Phosphorus trichloride evacuation

2015-07-18View Original

Thread Content

Recently, in connection with work-related tasks, there has been a need for designs related to phosphorus trichloride. I would like to invite everyone to discuss the following points: 1. Two storage tanks for phosphorus trichloride should be installed, one in operation and one as a backup. A underground tank for phosphorus trichloride should be set up, and a submersible pump will be used to transfer the phosphorus trichloride from this underground tank to the upper-level tank for use in product synthesis. The feed to the underground tank is interlocked with the discharge cut-off valve of the underground tank via a level gauge, and a level alarm along with probe monitoring are provided. The high-level tank is equipped with a weighing function, and the weighing system is interlocked with the start/stop control of the submersible pump; the submersible pump automatically shuts off once the weight in the high-level tank reaches a certain level, while it can only be started manually. An overflow pipe is provided in the high-level tank; in the event of a failure in the interlock system, phosphorus trichloride flows into the lower tank through this overflow pipe. I’m not sure what else needs to be improved, and I would appreciate your guidance. 2. Drainage arrangements for the low-level tanks, high-level tanks, and underground tanks: We plan to use a nitrogen seal for the low-level tanks. The exhaust from the nitrogen seal valve is connected to the drainage systems of the underground and high-level tanks, and after being washed with alkaline water, it is released into the atmosphere. Given the strict requirements regarding odor control at the site, we would appreciate it if experts could review this drainage plan and suggest any additional measures that may be necessary.
Reply #22015-07-18
Will water absorption occur after the exhaust gas is treated in a water scrubber? Just guessing and asking. . . . .
Reply #32015-07-20
1. After reading your description, I think it’s pointless to use underground channels; can feed be supplied directly from the lower-level channels to the higher-level ones? 2. By using a submersible pump, I think this pump becomes a pump for single-use only. 3. The evacuation design is quite good, but the nitrogen seal tank should be designed with a backflow prevention mechanism.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.