The environmental impact report for the Lu’an coal-to-oil project has not been approved...

2015-07-18View Original

Thread Content

The Ministry of Environmental Protection decided not to approve the environmental impact assessment report for this project due to the following main issues: First, the project is located upstream of sensitive groundwater areas such as the Xin’anquan Watershed Protected Area and the centralized water source in Wangqiao Town, and is quite close to them. In some areas of the plant, the capacity to prevent groundwater contamination is poor, posing a risk of contaminating the groundwater. The report does not adequately demonstrate the feasibility and reliability of the measures taken to protect the groundwater as well as those aimed at controlling environmental risks.   II. The surface water and atmosphere in the area where the project is located no longer have any environmental capacity, and the reduction measures proposed in the report are insufficient to ensure the environmental feasibility of this project.   III. The report fails to provide sufficient evidence regarding the feasibility and reliability of preventing wastewater discharge under the normal operating conditions of the project, and it does not conduct an environmental impact assessment for emergency wastewater discharge from the project.   IV. The report has issues in aspects such as engineering analysis, status assessment and impact prediction, and public participation. The data on pollutant source strengths were not verified based on the actual conditions of the project; the investigation of the current state of the atmospheric environment was inadequate; the feasibility of pollution control measures was not properly assessed; public participation was ineffective; and the setting of protection distances did not comply with relevant regulations.   V. The sources of the overall project emission indicators do not meet the requirement of \"a 2-fold reduction substitution\" stipulated in the Interim Measures for the Review and Management of Total Emission Indicators for Major Pollutants in Construction Projects; in principle, indicators from the power industry shall not be used for the total emission indicators of pollutants generated in the production processes.
Reply #22015-07-18
During the same period, another coal-to-gas project that was in the testing phase also failed to receive approval. The environmental impact assessment report for Yili Xintian’s 2 billion cubic meter coal-to-natural gas project was not approved. http://bbs.hcbbs.com/forum.php?mod=viewthread&tid=1420997&extra=page%3D1
Reply #32015-09-02
Currently, environmental review and approval processes are becoming increasingly mandatory and stringent across various regions, which serves as an excellent practical guarantee for the sustainable development of our country!
Reply #42015-09-02
Strict requirements are indeed necessary; there is a reason why only China has been actively carrying out coal projects to this day. The pollution problem can’t be solved :)
Reply #52015-09-07
According to reports, Lu’an Group held a meeting this morning and announced that \"all operations at the site will be suspended for two months.\"
Reply #62015-09-10
The Prime Minister has spoken~~So the Environmental Protection Department has become more determined~~But it’s a good thing, as it benefits both the country and its people~~
Reply #72015-09-10
Seeing the first one, this project is definitely worth pursuing!
Reply #82015-09-10
According to reports, Lu’an Group held a meeting this morning and announced that \"all operations at the site will be suspended for two months.\"
Reply #92015-10-22
Luan Group wants its employees to work without pay. http://www.jiemian.com/article/411085.html
Reply #102015-10-22
We **are still in a model that prioritizes economic gains at the expense of the environment. Although it’s realized too late, such a change in pattern cannot be brought about in a short time. Therefore, the increasingly strict requirements for launching new projects clearly demonstrate that there is a deep understanding of these political aspects, and corresponding policies are being implemented step by step to address these issues. Spreading high-pollution, high-hazard projects evenly among everyone** – this is the only way to prevent the Earth’s environment from being damaged. We should strongly condemn the practice of moving highly polluting industries to countries such as the United States, which is a practice adopted by developed nations.
Reply #112015-11-04
To keep going is seeking death; to stop is waiting for it. If I had known it would be like this, I wouldn’t have been so overconfident; I always thought we could proceed with construction while getting approvals, but I’ve gone too far this time.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.