Thread Content
I’m very curious about how pipeline installation is carried out on offshore petrochemical platforms Is it about transporting the construction team and materials to the sea for installation? Is it still installed on land, with only simple assembly at sea?
It must be constructed and pre-tested on land; after direct installation at sea, only the marine connection sections are installed and inspected. The costs at sea are too high; we should minimize them as much as possible.
So can this method be applied on land?
Yes, there are large jetty ductwork systems built in China at low prices, which can be transported by sea to destinations such as Russia and Australia. Broaden your horizons – fully modular pipe installation! - Powered by Discuz! http://bbs.hcbbs.com/thread-1422468-1-1.html
At sea, one issue is the high labor costs, and another is that it’s difficult to install such large devices at sea. Today, ocean engineering is carried out in a modular manner: the individual components are installed on land, and then they are simply assembled at sea.
It has such applications; they are also used on bridges. The Sutong Bridge was constructed by assembling modules, each weighing over 2,000 tons
This is the trend for future development, right? In that case, the so-called EPC model will also change completely
On the other hand, if this is done domestically, labor costs there are quite low, which would actually increase the cost. Additionally, as mentioned in that post, the costs could rise by a quarter