HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Issues regarding pipe blind plates

2015-07-31View Original

Thread Content

Could an experienced colleague please explain how to install blind flanges on oil or solvent delivery pipelines during cutting and repair welding, as well as how to remove the solvent from areas where welding is being performed?
Reply #22015-07-31
The blind plate should be installed on the valve flange, on the side closest to where welding will take place, with one at each end. Pipeline purging can be done using water, steam, or nitrogen; finally, steam should be used for purging. Generally, purging is carried out first, followed by the installation of blind flanges.
Reply #32015-07-31
The original poster explained it very well – in a concise and practical way.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.