Confusions regarding ASPEN simulations of batch operations such as intermediate tanks

2015-08-20View Original

Thread Content

Regarding the issue of simulating batch operations such as intermediate tanks in ASPEN, the problem is that there are always some storage tanks or intermediate tanks in the process that do not operate continuously. For example, a tank has an inlet flow rate of 50, and after some time, a pump with a capacity of 10 m3 is used for discharge. How can such tanks or intermediate buffer tanks be modeled in ASPEN to represent this discontinuous behavior? It’s difficult to maintain mass conservation in such cases; please share your opinions! !
Reply #22015-08-20
1. Disconnect the process and simulate both ends. 2. Dynamic simulation. 3. Use a separator to simulate the tank outlet flow rate.
Reply #32016-06-17
Could you explain in detail the third method? Using a component separator?

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.