Is purging required when shutting down reformation pre-hydrogenation? How to purge?

2015-09-03View Original

Thread Content

Can steam be used for purging during the shutdown of reformation pre-hydrogenation? Where is the steam used for purging usually located in your facility? Thank you to all the experts; here we use steam for purging at that location, while other places use temporary connections
Reply #22015-09-03
I’m not sure if this is correct, but 1) before starting the cleaning process, all the inlet and outlet valves on the coolers should be closed, and the drain valve should be opened to empty any water remaining in them. (2) Sweep the main pipe first, then the branch pipes; sweep the auxiliary pipes first, and then the control valves, with a short purging time for the control valves. Steam must not be allowed to enter the inlet pump chamber; the inlet pump can be purged only after a blind flange is installed on the inlet flange of the pump chamber. (3) During the purging process, attention must be paid to dehydration at the bottom of each tower and vessel to strictly prevent water hammer.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.