HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Location for venting and draining the equipment

2015-09-11View Original

Thread Content

I have a question: is there a significant difference between connecting the equipment’s vent and drain lines to the equipment itself and connecting them to the gas-liquid phase outlet lines? What is the impact during operations such as startup/shutdown, purging, and airtightness testing?
Reply #22015-09-11
There isn’t much difference here. Top venting can be led out in front of the gas phase outlet valve. When the bottom outlet is not at the very bottom of the equipment, a separate opening at the bottom of the equipment must be provided for venting.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.