HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Solve

2015-09-17View Original

Thread Content

Based on the test results of the diesel sample, to adjust the extraction temperature of the fractionation tower, how long back should the data be considered?
Reply #22015-09-17
The original poster didn’t explain it very clearly; adjustments should be made based on the sampling time points, and adjustments should be carried out promptly according to the analysis results.
Reply #32015-09-17
So how is the sampling time determined after making those adjustments? Is it based on experience, or is there some calculation method? ?
Reply #42015-09-18
Yeah, if the sample is taken at 10 a.m., what time should we check the diesel that was drawn?
Reply #52015-09-18
It depends on the number of devices that follow after the diesel is extracted, as well as the volume of the pipelines used by those devices. It’s an approximate figure calculated based on the extraction rate; for us, it’s roughly one hour
Reply #62015-09-18
Thank you, that’s exactly what I meant

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.