HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Abbreviations in the Aspen control panel

2015-09-23View Original

Thread Content

When simulating processes and checking the results in the Aspen control panel, we come across many abbreviations such as SKW, TKW, etc. We would appreciate it if the teacher or other experts could help explain this: ** ERROR IN THE “BLOCK” PARAGRAPH WHICH BEGINS ON LINE 406. BLOCK NAME: C-201; MODEL NAME: RADFRAC. SKW: P-SPEC; TKW: PRES REAL VALUE ENTERED (5025.0000). WHEN CONVERTED TO SI UNITS, THIS VALUE EQUALS 0.50250000E+09, WHICH EXCEEDS THE UPPER LIMIT OF 0.10000000E+09.**
Reply #22015-09-24
Second keyword, third keyword
Reply #32017-05-27
How do I run the control panel?

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.