HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Location of the liquid air extraction port in the lower column and control of the liquid air level in the lower column

2015-09-26View Original

Thread Content

According to the installation drawings, the location of the oxygen-enriched liquid air outlet at the top of the tower is 350 mm above the reference height; the reference height is the junction between the lower tower body and the bottom head of the tower. So what level should be set for controlling the liquid air level?
Reply #22015-09-28
Follow the operating parameters provided by the manufacturer; since heat exchange is not involved, it’s sufficient to simply cover the pipe opening~~
Reply #32015-09-28
One more question: whose design is this? Can the extraction opening be designed at the bottom of the head?~~

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.