2015-10-06View Original

Thread Content

Colleagues, who has the internal compression air separation purging plan available? This should include information on the purging of process flow pipelines, product pipelines, and steam pipelines – the more, the better. Thank you
Reply #22015-10-06
The purging plan should still be prepared based on one’s own process flow and site conditions. The format of the plan is generally the same, but the content needs to be tailored accordingly to the specific site conditions and processes. Purging must be carried out thoroughly for each pipeline, and qualification standards as well as criteria for testing must be established. Make sure all the inspection tools are ready.
Reply #32015-10-07
The purging plan varies depending on the process, and it also changes with the source of the purging gas; I understand that, but the underlying principles behind the purging plans are the same across different manufacturers. Who has a plan I can use as a reference? Thank you:):)
Reply #42015-10-07
It’s essentially a detailed elaboration based on the technical specifications
Reply #52015-10-07
:Lol, I signed a non-disclosure agreement, so I can’t help you
Reply #62015-10-08
Is a confidentiality agreement also required for the purging plan? Have you even applied for a patent on your purging scheme? To play, let me give you a brief introduction! People can enter the inlet and outlet of the air compressor to carry out cleaning tasks. The packing in the pre-cooling system and the molecular sieve adsorbents are not installed; thereafter, the pipes are purged. Valves are removed when necessary, and instruments are taken apart as well. Once everything is satisfactory, they are reinstalled, and the purification process continues for the subsequent sections. Now, please continue the discussion:
Reply #72015-10-09
Blowing is carried out in stages: the air compressor pipes are cleaned manually, while the pipes of the booster are cleaned through manual blasting. After that, pre-cooling, purification, cooling, and distillation are all performed in stages; only after one stage is completed can the next one begin. Our approach follows this sequence roughly. Finally, it should be noted that the plan needs to be reviewed together by everyone!
Reply #82015-10-10
Dear sea friends, is there a specific purging plan available for me to refer to and learn from?* :)
Reply #92015-10-10
Yes, add me on Q to get in touch. It’s not easy to share company-related information here, so I’ll send it to you privately
Reply #102015-10-10
419305521 Thank you!
Reply #112015-10-14
It’s similar to the driving option – you can drive wherever you want to

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.