Technical discussion: For the pump added later, can the foundation be constructed this way?

2015-10-10View Original

Thread Content

This post was last edited by hesonchang214 on 2015-10-11 21:24. For the newly added pumps (with a weight of no more than 100 KG), a foundation is required. Is it possible to drill holes directly into a concrete floor with a thickness of 250 MM, insert rebar, and then pour concrete for the foundation?
Reply #22015-10-10
That’s how my company does it anyway! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !
Reply #32015-10-13
As long as the vibration is mild, there’s no problem
Reply #42015-10-14
Generally, it involves isolation and rebuilding the underlying foundations from scratch. . . . . . . . . . .

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.