【Daily Question】Question from Issue 20151018

2015-10-18View Original

Thread Content

Participation reward: 2 Wealth. Reward for correct answer: 9 wealth. Regarding the requirements for the installation of building drains, which of the following is correct? A. Organized drainage should be employed, with the width of the apron being around 1500 mm. B. The slope of the apron can range from 3% to 5%. C. When a concrete apron is used, it is not necessary to provide expansion joints. D. The gap between the apron and the exterior wall can be 3 to 5 mm, and this gap should be filled with an asphalt-based substance. Answer: B
Reply #22015-10-18
Regarding the requirements for the installation of building aprons, the following (B) is correct. A. Organized drainage should be employed, with the width of the apron being around 1500 mm. B. The slope of the apron can range from 3% to 5%. C. When a concrete apron is used, expansion joints are not necessary. D. The gap between the apron and the exterior wall can be 3 to 5 mm, and this gap should be filled with an asphalt-based substance
Reply #32015-10-18
B. The slope of the drainage surface can be 3% to 5%
Reply #42015-10-18
I think answer B should be the correct one
Reply #52015-10-18
Regarding the requirements for the design of building aprons, the following statement (B. The slope of the apron can be 3%–5%) is correct.
Reply #62015-10-18
B. The slope of the drainage surface can be 3% to 5%
Reply #72015-10-18
B、---------------------------------------------------------
Reply #82015-10-18
Regarding the requirements for the installation of building aprons, the following (B) is correct. A. Organized drainage should be employed, with the width of the apron being around 1500 mm. B. The slope of the apron can range from 3% to 5%. C. When a concrete apron is used, expansion joints are not necessary. D. The gap between the apron and the exterior wall can be 3 to 5 mm, and this gap should be filled with an asphalt-based substance
Reply #92015-10-18
B. The slope of the drainage surface can be 3% to 5%
Reply #102015-10-18
Regarding the requirements for the installation of building aprons, the following (B) is correct. A. Organized drainage should be employed, with the width of the apron being around 1500 mm. B. The slope of the apron can range from 3% to 5%. C. When a concrete apron is used, expansion joints are not necessary. D. The gap between the apron and the exterior wall can be 3 to 5 mm, and this gap should be filled with an asphalt-based substance
Reply #112015-10-18
Regarding the requirements for the installation of building aprons, the following (B) is correct. A. Organized drainage should be employed, with the width of the apron being around 1500 mm. B. The slope of the apron can range from 3% to 5%. C. When a concrete apron is used, expansion joints are not necessary. D. The gap between the apron and the exterior wall can be 3 to 5 mm, and this gap should be filled with an asphalt-based substance

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.