Acceptance at pipeline installation site

2015-10-19View Original

Thread Content

After the pipeline installation is completed, I will go to the site with the installation team to conduct the acceptance inspection. I would like to learn about some precautions to take during this process; could anyone please give me some advice? Thank you. Alternatively, could you recommend some books that I can read on this topic? Thanks!
Reply #22015-10-20
Acceptance is carried out in accordance with the drawings and quality documents; return of materials supplied by the client may be required. After the inspection, a visa should be obtained, and then an application should be made for the project progress payment.
Reply #32015-10-20
On-site, the main task is to compare with the construction drawings to check for any discrepancies, with an emphasis on reviewing the weld inspection records.
Reply #42015-10-20
Take a look at the knowledge related to project costs.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.