HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

About Honeywell’s TPS system

2015-10-24View Original

Thread Content

After modifying the flowchart of the TPS system, is it sufficient to use File – Save as with Validation? Then, for each GUS at the lower operation stations, does it need to be modified individually, or can synchronized modifications be carried out through the engineer station? Also, how should active and passive I/O input points be handled?
Reply #22015-10-24
The last time TPS was used was back in 2007; it’s a system from such a long time ago
Reply #32015-10-24
This system is a bit old, and it’s my first time dealing with it, so I don’t quite understand it. Could you answer my question?
Reply #42016-03-25
Just change one in the flowchart; the rest can be transmitted using an Ethernet cable. www.rongchuangdianzi.com Rongchuang Electronics specializes in Honeywell hardware and services; feel free to follow us! Thank you! !

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.