HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

For the parking air-cooled tower, water should be shut off first before gas is stopped

2015-10-27View Original

Thread Content

Why is the gas supply cut off after the water supply is stopped? What accidents is this meant to prevent?
Reply #22015-10-28
The main purpose is to prevent water from overflowing in the air-cooled tower and flowing back into the air compressor (due to a failed check valve) or into the molecular sieve. When the air compressor is shut down, the pressure inside the tower drops, which hinders the return of water. Additionally, if the low-temperature water pump continues to operate, the aforementioned risks remain~~
Reply #32015-10-28
When an air-cooled tower is operating normally, there is a certain pressure present. This pressure prevents water from entering the area in front of the check valve at the compressor outlet due to high pressure. If the air supply is stopped first and then the water supply, it is possible for the water level to rise above the air inlet of the air-cooled tower, resulting in water flowing back into the air duct at the compressor outlet. If the check valve fails, it can cause severe damage to the compressor

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.