HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Code for butt welding of I-beams

2015-11-01View Original

Thread Content

For the installation of the guides for a 2-ton electric hoist, the I-beams required need to be joined by welding two sections together, and the contractor used butt welding for this purpose. I heard that when welding I-beams, the weld joints on the two sides need to be offset from each other, and the joints should be welded at a 45° angle. I’m not sure if there are any relevant standards; if anyone knows about them, please help by sharing the welding standards for I-beams. Thank you!

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.