Thread Content
How to write welding procedure cards, welding procedure specifications, and welding procedure qualification reports? Is there a fixed format? I really don’t understand at all; please give me some guidance.
Based on the criteria you used, check under that same set of criteria. . . Of course, your company also has its own format; you just need to check whether it is complete and correct. .
There is a recommended format in 47014, but you should pay attention to the order between them. A welding procedure qualification report must be available first, before a welding procedure card or instruction sheet can be created. Actually, what is the difference between a process card and a instruction manual?
Buy a combined edition of NB/T47014, NB/T47015, and NB/T47016, study it carefully, and first complete the welding procedure qualification in light of the company’s actual conditions. If the company’s welding procedure qualification has been completed, borrow it from the document room to take a look. Prepare the product’s welding procedure card or welding procedure guide based on the company’s welding procedure qualification. If the company has not conducted welding procedure qualification, the workload will be quite large.
This post was last edited by lzm2013 on 2015-11-5 09:44. Thank you all for your help; I have found the standards recommended by everyone, and those who need them can download them.:) http://wenku.baidu.com/view/768fb7b183c4bb4cf7ecd1a1.html?from=search
All of the things you mentioned should be available in your organization’s control form sheets; otherwise, there is a problem with your system
I don’t understand at all; even if it’s given to you, what’s the use of having it? ? ? Hire a welding engineer right away! :lol